喷气增焓与喷液技术对比.ppt

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
R E F R I G E R A T I O N A N D A I R C O N D I T I O N I N G CONFIDENTIAL S.Watts * page * Vapour Injection vs Liquid Injection for Red Ice Project S.Watts * page * 6 2’ 5b 4 4 6 LIQUID INJECTION VAPOUR INJECTION 6 1 2, 3 4 5 5b 5a 6 1 6 2, 2’ 4 5 5b 3 EXV lower discharge superheat increase of condenser massflow higher discharge temperature higher heating capacity S.Watts * page * Liquid Injection 6 1 2, 3 4 5 5b 5a 6 1 6 2, 2’ 4 5 5b 3 EXV Vapour Injection Economizer HX extra space required EXV Solenoid valve NC Large Φ rigid piping, brazed connections + thermal insulation Compressor: large flexible(!) pipe, ext. brazed/ int. flanged connections … PWM solenoid valve NC control + valve integrated (EBX) … Small Φ flexible steel pipe, screwed connector Compressor: thin flexible pipe, small screwed connector HARDWARE COMPARISON 1 component per compressor ! S.Watts * page * VAPOUR / LIQUID INJECTION COMPARISON Operating point HPSH380 -20/65/5/5 Vapour injection Liquid injection Dry (5K superheat) Wet Early Late T disch 130/135 °C (1) dry 85/90 °C tbd Heating capacity increase / stdd +40/+45% (2) dry +5/+10% tbd COPh increase +10/+15% = dry -5 / 0% (5) tbd Pabs increase +30/+35% (2) = dry +10/+15% tbd PecoHX /Pcd (%) +20/+25% (3) = dry - tbd Inj. piping diam.(mm) ~20mm (4) = dry ~5mm tbd no margin for suction superheat higher than 5K stdd compressor can’t be re-used ! (motor resizing required, or scrollset downsizing; manifolding: only quadros could be converted in trios) economizer HXs duty: ~20% of condenser duty big constraint of implementation (pipes and injection holes), specifically on large scrolls not critical because unit is operated only few days per year at this condition MAP benefit design benefit potential capacity benefit Capacity benefit COP benefit S.Watts * page * VAPOUR / LIQUID INJECTION COMPARISON Operating point HPSH380 -7/48/2/5 Vapour injection Liquid injection Dry (5K supe

文档评论(0)

zxiangd + 关注
实名认证
内容提供者

本人从事教育还有多年,在这和大家互相交流学习

1亿VIP精品文档

相关文档