奥克兰海湾大桥东跨地震复原工程.ppt

  1. 1、本文档共37页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
nhbjkbkj Bay Area Toll Authority San Francisco-Oakland Bay Bridge East Span Seismic Replacement Project Self Anchored Suspension Span (SAS) A long history…. On the right track…. ZPMC - Shanghai, China Skyway (2007) Oakland Touchdown Under Construction Completed Skyway Completed Skyway The Self Anchored Suspension Span is the signature segment of the bridge. The single tower design was selected in part due to the better geological conditions just off Yerba Buena Island. The new span will be founded on bedrock and not the redwood tree piles currently stuck in the mud. 19 years ago, on October 17, 1989, a 6.9 magnitude earthquake struck the Bay Area Centered 60 miles away from San Francisco, the Loma Prieta Earthquake collapsed a 50-foot section of the San Francisco – Oakland Bay Bridge, causing two cars to fall to the deck below, leading to the single fatality on the bridge. The bridge was closed for repairs for a month and one day, reopening on November 18. After the bridge was repaired, it was determined that the long term solution for the east span of the Bay Bridge should be replacement. A Signature Self-Anchored Suspension Span was selected to be constructed. The single tower is anchored into bed rock just off the island. The tower is actually composed of four separate legs that are connected by seismic fuses at the top of the tower that are designed to sustain and absorb damage from a major quake. The bridge is has a design life of 150 years. The new bridge design already has a long history that spanned a number of design alternatives and multiple gubernatorial administrations. There have been great challenges from spiking material costs, lack of insurance after 9/11, and only receiving a single bid in 2005. We have turned the corner. After the last round financial challenges, the State legislature passed AB144 that provided a funding package for the project and established the Toll Bridge Program Oversight Committee. The committee is c

文档评论(0)

追风少年 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档