- 1、本文档共37页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
nhbjkbkj Bay Area Toll AuthoritySan Francisco-Oakland Bay Bridge East Span Seismic Replacement Project Self Anchored Suspension Span (SAS) A long history…. On the right track…. ZPMC - Shanghai, China Skyway (2007) Oakland Touchdown Under Construction Completed Skyway Completed Skyway The Self Anchored Suspension Span is the signature segment of the bridge. The single tower design was selected in part due to the better geological conditions just off Yerba Buena Island. The new span will be founded on bedrock and not the redwood tree piles currently stuck in the mud. 19 years ago, on October 17, 1989, a 6.9 magnitude earthquake struck the Bay Area Centered 60 miles away from San Francisco, the Loma Prieta Earthquake collapsed a 50-foot section of the San Francisco – Oakland Bay Bridge, causing two cars to fall to the deck below, leading to the single fatality on the bridge. The bridge was closed for repairs for a month and one day, reopening on November 18. After the bridge was repaired, it was determined that the long term solution for the east span of the Bay Bridge should be replacement. A Signature Self-Anchored Suspension Span was selected to be constructed. The single tower is anchored into bed rock just off the island. The tower is actually composed of four separate legs that are connected by seismic fuses at the top of the tower that are designed to sustain and absorb damage from a major quake. The bridge is has a design life of 150 years. The new bridge design already has a long history that spanned a number of design alternatives and multiple gubernatorial administrations. There have been great challenges from spiking material costs, lack of insurance after 9/11, and only receiving a single bid in 2005. We have turned the corner. After the last round financial challenges, the State legislature passed AB144 that provided a funding package for the project and established the Toll Bridge Program Oversight Committee. The committee is c
您可能关注的文档
- 20岁女大学生应该如何保养皮肤.pdf
- 32m简支箱梁贝雷支架现浇施工方案.doc
- 45_75_45m边跨现浇段碗扣式支架计算书12.17.doc
- midas_Civil_2010斜拉桥专题—斜拉桥设计专题.ppt
- T梁结构体系转换中临时支座施工技术_pdf.pdf
- V形刚构组合连续梁施工技术.pdf
- 安全技术交底汇编p.pdf
- 保险行业研究报告.ppt.pdf
- 北京石景山斜拉桥转体法施工技术.pdf
- 北京市五环路曲线斜拉桥转体施工设计.pdf
- 10《那一年,面包飘香》教案.docx
- 13 花钟 教学设计-2023-2024学年三年级下册语文统编版.docx
- 2024-2025学年中职学校心理健康教育与霸凌预防的设计.docx
- 2024-2025学年中职生反思与行动的反霸凌教学设计.docx
- 2023-2024学年人教版小学数学一年级上册5.docx
- 4.1.1 线段、射线、直线 教学设计 2024-2025学年北师大版七年级数学上册.docx
- 川教版(2024)三年级上册 2.2在线导航选路线 教案.docx
- Unit 8 Dolls (教学设计)-2024-2025学年译林版(三起)英语四年级上册.docx
- 高一上学期体育与健康人教版 “贪吃蛇”耐久跑 教案.docx
- 第1课时 亿以内数的认识(教学设计)-2024-2025学年四年级上册数学人教版.docx
文档评论(0)