属地管理实施方法和技巧培 训课件.ppt

属地管理实施方法和技巧培 训课件.ppt

  1. 1、本文档共50页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* Only do a RACI if it will add value. * Activities: individual activities performed to achieve/complete the process analyzed. May range from higher level activities to very detailed step-by-step tasks. Participant roles: people, areas, and/or departments who perform the activities in the process being analyzed. The interrelationship of these two or the type/degree of participation are indicated in the squares on the grid. * Read Chart * Activities or decisions to be charted should be important, required and controllable Important: if it’s not value-added activity, a RACI should not be done Controllable: Do the people involved in the responsibility process have reasonable control of the activity or decision? Required Is it a meaningful batch of work? Is it easily and logically assigned? Can it be readily evaluated upon completion? The first step is to prepare a list of the activities which will be charted There are many sources for identifying activities. The difficulty is knowing what level of detail to get into. Too broad of category doesn’t really help clarify RRs within a department but might be a good starting point to agree on RRs between departments. Too detailed a RACI is time consuming and non-value added to those only needing an overview of the process, however it does become a starting point for clarifying individual job descriptions. If developing a RACI during the As-Is phase, these questions help identify opportunities. If performing the RACI once the To-Be process has been developed, this becomes another validation point. * The level of detail gone into each activity of a process flow will determine the level of the participant role. For example, if the activity is “design new products” the participant roles could include engineering, production, and marketing departments. However, if the activity is “contact supplier with specifications,” the participant role would ratchet down a few levels and become more specific (e.g., technical purchasin

文档评论(0)

企业资源 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档