- 1、本文档共50页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* Only do a RACI if it will add value. * Activities: individual activities performed to achieve/complete the process analyzed. May range from higher level activities to very detailed step-by-step tasks. Participant roles: people, areas, and/or departments who perform the activities in the process being analyzed. The interrelationship of these two or the type/degree of participation are indicated in the squares on the grid. * Read Chart * Activities or decisions to be charted should be important, required and controllable Important: if it’s not value-added activity, a RACI should not be done Controllable: Do the people involved in the responsibility process have reasonable control of the activity or decision? Required Is it a meaningful batch of work? Is it easily and logically assigned? Can it be readily evaluated upon completion? The first step is to prepare a list of the activities which will be charted There are many sources for identifying activities. The difficulty is knowing what level of detail to get into. Too broad of category doesn’t really help clarify RRs within a department but might be a good starting point to agree on RRs between departments. Too detailed a RACI is time consuming and non-value added to those only needing an overview of the process, however it does become a starting point for clarifying individual job descriptions. If developing a RACI during the As-Is phase, these questions help identify opportunities. If performing the RACI once the To-Be process has been developed, this becomes another validation point. * The level of detail gone into each activity of a process flow will determine the level of the participant role. For example, if the activity is “design new products” the participant roles could include engineering, production, and marketing departments. However, if the activity is “contact supplier with specifications,” the participant role would ratchet down a few levels and become more specific (e.g., technical purchasin
您可能关注的文档
- 2梅河口市集中供热扩建工程可行性研 究报告.doc
- 5S项目 策划书.doc
- 010驻点客户经理 的特质.ppt
- 2006年山东某湖环境综合治理项目可行性研 究报告.doc
- 2011餐饮欢聚怡堂项目 策划书.doc
- it运维项 目方案.doc
- 北京西二旗项目营销策划建议 书正品.doc
- 步步高之企 业文化.ppt
- 创新基金可行性研究报 告模板.doc
- 大型商业地产项目顶级策划模式(完 整版).doc
- GB/T 32151.38-2024温室气体排放核算与报告要求 第38 部分:水泥制品生产企业.pdf
- 中国国家标准 GB/T 32151.38-2024温室气体排放核算与报告要求 第38 部分:水泥制品生产企业.pdf
- 《GB/T 22069-2024燃气发动机驱动空调(热泵)机组》.pdf
- GB/T 22069-2024燃气发动机驱动空调(热泵)机组.pdf
- 中国国家标准 GB/T 22069-2024燃气发动机驱动空调(热泵)机组.pdf
- 中国国家标准 GB/T 11064.1-2024碳酸锂、单水氢氧化锂、氯化锂化学分析方法 第1部分: 碳酸锂含量的测定 滴定法.pdf
- GB/T 11064.1-2024碳酸锂、单水氢氧化锂、氯化锂化学分析方法 第1部分: 碳酸锂含量的测定 滴定法.pdf
- 《GB/T 11064.1-2024碳酸锂、单水氢氧化锂、氯化锂化学分析方法 第1部分: 碳酸锂含量的测定 滴定法》.pdf
- GB/T 1148-2024内燃机 铝活塞.pdf
- 中国国家标准 GB/T 1148-2024内燃机 铝活塞.pdf
文档评论(0)