云南省楚雄州元双公路新建工程项目及岗位技术总结报告
目录
第一章 工程概况
一、工程简介·························································2
二、工程地质、水文、气象情况·········································2
三、主要工程数量·····················································3
四、桥梁类型和技术参数···············································3
五、设计标准·························································4
第二章 工程项目施工组织
一、施工组织机构·····················································5
二、工程任务划分·····················································7
三、工程管理目标·····················································8
四、临时工程及设施的布置·············································9
五、施工技术准备····················································10
六、施工组织措施····················································10
第三章 主要分项工程施工
一、软基处理工程····················································13
二、路基土石方工程··················································14
三、防护和排水工程··················································16
四、涵洞工程施工方法················································18
五、桥梁工程施工····················································19
第四章 施工岗位技术总结
一、岗位情况························································23
二、项目技术总结···················································25
三、岗位技术总结···················································28
结束语······························································29
致谢································································30
参考文献
附件
第一章 工程概况
一、工程简介
本合同段起于西邑村西K133+660,线路布设于子午坝子西侧山前缓坡,于K135+200接省道218线(K24+100),后路线右转沿省道218线改建,于K136+100经三家村,而后于K139+500过杞木村,线路于K140+460处线路离开省道218线新建,在K141+950处接上省道218,线路沿老路改建于K144+080处过段家村,后线路离开老路新建,止于塘房村K144+755。本合同段长9.95276公里。
建设单位:云南元双公路建设指挥部
项目名称:云南省元谋县至双柏县公路改建工程第十五合同段
设计单位:云南省交通规划设计研究院
监理单位:云南云通监理咨询有限公司
施工单位:云南第三公路桥梁工程有限责任公司
项目负责人:李荣平
合同总价
合同规定的工期为28个月。监理单位于2009年3月1日下发开工令,项目合同工期至2011年6月30日止。
二、工程地质、水文、气象情况
(一)、工程地形、地貌状况:
本合同段地处云南山字型构造体系西翼内侧马蹄形盾地北部,地形地貌及山脉水系受构造形态的控制,山脉属哀牢山系东麓支干余脉,呈西北、东南走向,路线走向与山脉走向基本平行,地形复杂多变,地势中部高南北低,起伏倾斜,路线区域北端楚雄盆地最低海拔1776米,中部分水岭处最高海拔2072米,南端路线止点处最低海拔186