西安市****厂家属区改造10#住宅楼
施
工
组
织
设
计
二〇一〇年四月三十日
目 录
第一章、编制依据·················································1
第二章、概况·····················································1
第三章、施工方案和方法···········································8
第一节、施工测量方案············································8
第二节、地下室工程施工方案和方法································11
1.基础垫层施工方案·············································11
2.底板防水施工方案·············································12
3.大体积混凝土施工方案·········································12
4.地下室模板工程施工方案·······································25
5.地下室土方回填·············································· 33
第三节、泵送混凝土工程施工方案和方法····························33
第四节、模板工程施工方案和方法··································53
第五节、钢筋工程施工方案和方法··································56
第六节、防水工程施工方案和方法··································63
第七节、导轨式爬升脚手架施工方案和方法··························82
第八节、砌体工程施工方案和方法··································97
第九节、建筑装饰工程施工方案和方法······························99
第十节、给排水工程施工方案和方法································108
第十一节、电气工程施工方案和方法································120
第十二节、暖通工程施工方案和方法································132
第四章、施工工期及进度计划······································135
第一节 施工段的划分············································135
第二节 主要进度目标控制点······································136
第三节 主要施工工序············································136
第四节 施工管理目标············································137
第五节、工期进度控制方法与原则·································138
第六节、实现工期进度计划的动态控制·····························139
第七节、制定保证工期的技术措施·································139
第八节、雨季施工技术措施·······································143
第九节、高温季节施工技术措施···································144
第十节、冬季施工技术措施·······································145
第五章、项目经理和主要技术、管理人员的配备······················146
第一节、项目经理部的组成·······································146
第二节、组织机构···············································148
第六章、质量及质量保证体系与措施································149
第一节、质量控制目标·········································