- 1、本文档共13页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
本科毕业论文(设计) 外文翻译
原文:
Risk Management in BOT Projects
Risk management in BOT projects is studied,following the risk management framework, i.e. risk identification, risk classification, risk analysis,risk attitude and risk response (or risk allocation).
1 .Risk identification in BOT projects
The risks of BOT projects can be identified in the following categories (Baker, 1986; cited in Nadeem, 1998): political risks; construction completion risks; operating risks; finance risks and legal risks.
2. Risk classification in BOT projects
There have been several types of risk classification. The following are some examples of them: Construction phase: completion delay, cost overrun, force majeure, political risk,infrastructure risk (referring to other facilities in direct competition with the BOT project in question). Operational phase: raw material supply, market, performance/technical, operation/maintenance, foreign exchange, other contingencies (Tiong, 1990b). Development phase: technology risk, credit risk, bid risk. Construction phase: completion risk,cost overrun risk, performance risk,political risk. Operating phase: performance risk,cost overrun risk, liability risk, equity resale risk, offtake risk (Beidleman et al., 1990): Global risks:- Political: government, technology- Legal: framework, type of agreement.- Commercial: market,input, currency- Environment: impact, ecological. Construction^ design,Elemental risks:- Technical: physical conditions, training.- Financial: form of technology- Operational: operation, maintenance, ownership,return, currency.- Revenue: demand, financing, evaluation, development (toll/tariff, Woodward et al” 1992).
There are some other classifications, some of which are: static or dynamic;
fundamental or particular; government source or private source; speculative or pure;
financial or non-financial; and measurable or immeasurable (Charoenpompatiana, 1998).
These classifications facilitate all the following steps of the risk management frame
您可能关注的文档
- 法务实习报告范文.doc
- 高中心理健康教育活动课教案.doc
- 格力电器外协配套物资企业供应链管理与库存控制(二).doc
- 国际货物运输方案.doc
- 会计手工综合模拟实训实习报告.doc
- 基于Internet的多媒体教学系统结构.doc
- 健康养生论文:健康与养生.doc
- 酒水营销:三维复合渠道系统操作模式.doc
- 绿化养护协议.doc
- 论计算机辅助教学的实施策略.doc
- 2010-2023历年福建省厦门六中高一下学期期中考试地理试卷(带解析).docx
- 2024年中国二线模拟语音卡市场调查研究报告.docx
- 2024年塑料薄膜摆锤冲击试验机项目可行性研究报告.docx
- 2024年中国医药市场调查研究报告.docx
- 2010-2023历年福建省福州三中高三下学期第六次模拟考试(理综)生物部分.docx
- 2010-2023历年福建省三明市普通高中高三上学期联合命题考试历史试卷.docx
- 2010-2023历年福建省三明一中高三上学期第三次月考生物试卷.docx
- 2010-2023历年福建省惠安惠南中学高二下学期期末考试政治试卷(带解析).docx
- 2010-2023历年福建省宁化城东中学七年级上学期期中考试生物试卷(带解析).docx
- 2010-2023历年福建省福州八县市一中高三上学期期中联考历史试卷(带解析).docx
文档评论(0)