- 1、本文档共17页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文翻译
原文:
ABSTRACT
This paper discusses the implementation of semi-permanent, high-mast pole-mounted lighting for nighttime road work construction and maintenance based on an installation along Interstate 90 in Albany, New York. The high-mast lighting system met state lighting performance specifications. There were no recorded accidents at the site during the construction period. Although this is largely attributable to roadway closures allowed during part of the project, the consensus of the contractor and transportation agency is that the lighting contributed at least in part to an increase in safety. The cost of the high-mast lighting system was approximately 16% higher than the estimated cost of the portable light towers. Despite the higher estimated cost of the high-mast lighting system, the economic and societal benefits appear considerable in this particular location, namely an urban, heavily traveled throughway. In particular, this lighting approach probably allowed the duration of the construction period to be shortened, leading to a reduction in worker and driver risk exposures and to a reduction in traffic delays for motorists. An approach to identifying projects where this lighting technique might be warranted is presented.
INTRODUCTION
Semi-permanent, high-mast (70 ft.) pole-mounted fixtures were used by a construction contractor hired by the New York State Department of Transportation (NYSDOT) to illuminate nighttime road work construction and maintenance along a three-mile stretch of Interstate 90 (I-90) in Albany, N.Y., as an alternative to the more common portable light towers (1). The high-mast lighting was installed prior to construction work and removed after the construction project was completed, about seven months later. Freyssinier et al. (2) documented the high-mast lighting system and its performance in terms of photometric performance, visibility and glare. The high-mast lighting system was found to have performed well and as intended. Th
您可能关注的文档
- 毕业论文(泵相关实验)--流体综合试验系统的设计.doc
- 毕业论文(设计)开题报告--嵌入式技术.doc
- 毕业论文(设计)开题报告--小型公园.doc
- 毕业论文--电梯的自动化控制.doc
- 毕业论文--基于PLC的电梯控制系统软件设计.doc
- 毕业论文--基于PLC的六层电梯控制系统.doc
- 毕业论文--基于SWOT分析的慈溪家电产业集群化发展研究.doc
- 毕业论文--加速农村土地流转_推进农业规模经营.doc
- 毕业论文开题报告——广告翻译的本地化研究.doc
- 毕业论文--某办公楼中央空调系统.doc
- 金融产品2024年投资策略报告:积极适应市场风格,行为金融+机器学习新发现.pdf
- 交运物流2024年度投资策略:转型十字路,峰回路又转(2023120317).pdf
- 建材行业2024年投资策略报告:板块持续磨底,重点关注需求侧复苏.pdf
- 宏观2024年投资策略报告:复苏之路.pdf
- 光储氢2024年投资策略报告:复苏在春季,需求的非线性增长曙光初现.pdf
- 公用环保2024年投资策略报告:电改持续推进,火电盈利稳定性有望进一步提升.pdf
- 房地产2024年投资策略报告:聚焦三大工程,静待需求修复.pdf
- 保险2024年投资策略报告:资产负债匹配穿越利率周期.pdf
- 政策研究2024年宏观政策与经济形势展望:共识与分歧.pdf
- 有色金属行业2024年投资策略报告:新旧需求共振&工业原料受限,构筑有色大海星辰.pdf
文档评论(0)