地铁高架施工组织设计(英文版)The Viaduct Construction Program of Contract 1280 Construction and Completion of BOONLAY MRT Extension.doc

地铁高架施工组织设计(英文版)The Viaduct Construction Program of Contract 1280 Construction and Completion of BOONLAY MRT Extension.doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
The Viaduct Construction Program of Contract 1280 Construction and Completion of BOONLAY MRT Extension Construction of Pile Foundation The contract contains 915 piles (including testing piles). To ensure the quality and progress of the project and according to the site hydro-geological condition and construction experience, as for those pile foundations with diameter of 1.0m, 1.2m or 1.3m, rotating excavating drilling machines are adopted to drill and metal casing to protect the wall. Therefore, one rotating excavating drilling machine of BG22, two of ZY-20 and one of RD180 will be applied together; and as for the minipile with a diameter of 0.3m, hydraulic pile driver NH70 will be employed. When the depth of the hole reaches 3m to the designated level, concreting should be made ready. Clear the residue at the bottom when drilling to the designated level and inform the supervisor immediately for check. Upon approval, lay in the pipe or the sleeve to concrete into piles. The steel bar cage is manufactured in the manufacturing yard section by section, and the required audial test pipe which is pre-embedded and grouting pipe should fix with the steel bar cage, and then the steel bar cage is placed into the hole by cranes. The concrete is purchased from the nearest commodity concrete stirring yard, transported by the stirring lorry and pumped into the formwork by the pump truck. The viaduct crosses with existing roads in much of the places in this project. Meanwhile, the roads below the viaduct need reconstruction. Therefore, the safety warning sign and the border piles are required on the site to guarantee the safety of the traffic and the construction, and someone should be assigned to guarantee the safety. 2. Pile Cap Construction When the pile foundation’s concrete strength reaches the requirement, the foundation excavation of pile cap should be commenced. The maximum depth of the buried pile cap in this project could not exceed 4.0m, we make comprehensive conside

您可能关注的文档

文档评论(0)

工程资料 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档