- 1、本文档共90页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
需全套CAD或三维图 联系QQ 695132052
摘要
本次设计新井为双鸭山矿业集团岭东煤矿0.9Mt/a的新井设计,共有3层设计可采煤层,平均总厚度为5.93m。设计岭东井田的可采储量为92.511Mt,服务年限为58.74a,划分两个水平开采。井田平均走向长2500m,平均倾斜长2000m,煤层平均倾角12°,属于缓倾斜煤层。
岭东煤矿采用双立井的开拓方式,分组集中大巷布置方式。共划分八个采区,其中首采区为1个,达产工作面1个。首采区为北一采区,大巷装车式下部车场,综合机械化采煤。年工作日为330天,采用“三·八”式工作制,工作面长为190m,每刀截深为0.8m,每日割七刀。主井采用箕斗提升,副井采用罐笼提升。由于岭东井田倾斜长度较长,且为缓倾斜煤层,以及煤层地质条件等因素影响,决定井田内全部采用走向长壁开采。
关键词 可采储量 采煤工艺 走向长壁
Abstract
The mine designing that the new mine is Shuang Ya Shan City mining industry Corp. Ling Dong coal mine new of 0.9 Mt/a time designs capital, common 3 layer of the m designing that average general thickness is 5.93 tier may cut coal. Mt designing that Ling Dong mine-field workable reserves is 92.511, the length of service is 58.74 as, level dividing two exploit. The average trend of mine-field grows 2500 ms , average incline is long 2000 ms, average dip angle of coal seam 12, belongs to the slow incline coal seam.
The developing way , grouping that the Ling Dong coal mine adopt to shaft pair concentrate big alleys arranging way. Divide eight mining area together, head mining area among them is 1 , amounts to 1 product face. Mining area is the north one mining area, the car park , synthetical mechanization cut coal on big alley entrucking style lower part. The annual workday is 330 day , adopt the three , eight dyadic character of service, face often is 190 ms , every knife intercepts depths being that 0.8 m, is everyday cut seven knives. The main shaft adopt skip lifting to fight against , the auxiliary shaft adopt a cage to be advanced. The length is longer since Ling Dong mine-field tilts, and for slow incline coal seam, inner affecting , deciding mine-field as mine as coal seam geology condition waits for a factor all adopt long trend wall coal mining law exploit. Since my knowledge is limited, be short of the certain scene experience. A little problem appears on the meeting hard to avoid designing middle
Key words recoverable reserves coalwinning technology
您可能关注的文档
- 玉溪煤矿2.4Mta新井设计(含全套CAD图).doc
- 司马煤矿2.4Mta矿井设计(含全套CAD图).doc
- 新阳矿1.5Mta新井通风安全设计(含全套CAD图).doc
- 七台河精煤集团公司新兴三矿1.5Mta新井设计(含全套CAD图).doc
- 双鸭山矿业集团集贤煤矿1.2Mta新井设计(含全套CAD图).doc
- 不连沟煤矿5.0Mta新井设计(含全套CAD图).doc
- 玉溪矿1.8Mta新井通风安全设计(含全套CAD图).doc
- 羊东煤矿1.5Mta新井通风设计(含全套CAD图).doc
- ZY120003862型掩护式液压支架设计(含全套CAD图).doc
- 祥华矿0.6Mta新井通风与安全设计(含全套CAD图).doc
文档评论(0)