- 1、本文档共14页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
JI Projects in the Russian Power IndustryMikhail Roganko.ppt
JI Projects in the Russian Power IndustryMikhail RogankovChief Executive Officer actingEnergy Carbon Fund Tel.: +7 (095) 727 30 74Fax: +7 (095) 727 30 96E-mail: ecf@ecf.elektra.ru Web-site: сarbonfund.ru ECF organisational structure RAO UESR on a Country’s Energy Sector Scale Structure of GHG emissions in Russia (according to the Third National Communication) PRIMARY ENERGY RESOURCES DEMAND (according to the Ministry of Energy in 2003) Potential of organizational/technological measures of energy resources saving by sectors for the period till 2020 UESR IS “CONDEMNED” TO JI 50% of equipment has reached the end of its lifetime (needs replacement/refurbishment) 67% of gas in the fuel mix – a nice opportunity for combined cycle technology and gas turbines Non-conventional renewables are less than 1% in the power mix while a lot of regional power utilities wants to develop them (a number of projects are well developed) 5,000 small hydro - in oblivion and needs rehabilitation Typical situation: CHP plants can replace old and low efficient boiler-houses’ and provide district heating improvement In some cases switch from coal/heavy oil to gas can be provided A great number of project proposals are facing the investment barrier Combined Cycle instead of Steam turbines Upgrading TPPs with gas turbines Switch from coal/heavy oil to gas Improvements in CHP and district heating systems (including decommissioning of old low efficient boiler houses) Renewables: rehabilitation of mini hydro (5,000 stations from 1 to 5 MW) wind stations (on-shore and off-shore): geothermal plants at Kamchatka peninsular (big program): medium-scale hydro Program projects (a number of small-scale measures of the same type united in one program): small steam turbines instead of steam pressure reduction and cooling devices; small hydro plant
您可能关注的文档
- 6.3 复化求积公式.ppt
- 6.10 板式塔.ppt
- 7.2 组合体的尺寸标注方法.ppt
- 8.1 高分子材料 8.2 陶瓷材料.ppt
- 7.7 Internet的基本服务功能随着Internet的飞速发展,目前.ppt
- 9.5 模拟退火.ppt
- 97-10-04.ppt
- 97-10人事生活化.ppt
- APEC Study Center Consortium Conference, San Francisco, .ppt
- APP用户0到1000万.ppt
- 2025年广西中考地理二轮复习:专题四+人地协调观+课件.pptx
- 2025年广西中考地理二轮复习:专题三+综合思维+课件.pptx
- 2025年中考地理一轮教材梳理:第4讲+天气与气候.pptx
- 第5讲+世界的居民课件+2025年中考地理一轮教材梳理(商务星球版).pptx
- 冀教版一年级上册数学精品教学课件 第1单元 熟悉的数与加减法 1.1.6 认识1-9 第6课时 合与分.ppt
- 2025年中考一轮道德与法治复习课件:坚持宪法至上.pptx
- 2025年河北省中考一轮道德与法治复习课件:崇尚法治精神.pptx
- 八年级下册第二单元+理解权利义务+课件-2025年吉林省中考道德与法治一轮复习.pptx
- 精品解析:湖南省娄底市2019-2020学年八年级(上)期中考试物理试题(原卷版).doc
- 2025年中考地理一轮教材梳理:第10讲+中国的疆域与人口.pptx
最近下载
本人在医药行业摸爬滚打10年,做过实验室QC,仪器公司售后技术支持工程师,擅长解答实验室仪器问题,现为一家制药企业仪器管理。
文档评论(0)