地震区预制溷凝土剪力墙连接.pdfVIP

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地震区预制溷凝土剪力墙连接.pdf

PRECAST CONCRETE SHEAR WALL CONNECTIONS FOR SEISMIC ZONES K.A. Soudki(l) and S.H. Rizkalla(2) ABSTRACT The precast concrete shear wall system is becoming very popular in North America for low , medium, and highrise construction due to the economical advantages possible with the ease and speed of assembly, and the high quality of the precast panels. The connections between panels are extremely important since they affect both the speed of erection and the overall integrity of the structure. This paper presents the results of the last two phases of a six-year research program conducted to investigate the behaviour and the capacity of fIfteen connection configurations used for precast load-bearing shear wall panels subjected to monotonic shear loading and large reversed cyclic loading conditions. Connection configurations include dry-packed plain surface, dry-packed plain surface with continuity reinforcement, dry-packed with two types of mechanical shear connectors in addition to the continuity bars , dry-packed with post-tensioning, and two types of dry-packed multiple shear keys. The research also include connections which support hollow-core slab with and without post-tensioning. The performance of new innovative connections, such as partial or complete debonding of the reinforcement continuity and the use of energy dissipating mechanical connections for the continuity reinforcement, were also examined. Three different levels of load normal to the connection to simulate the effects of gravity load were used. The research fmdings of this investigation were implemented in the design and construction of three 32-stories apartment buildings in Winnipeg, Manitoba. The connections considered

文档评论(0)

整理王 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档