网站大量收购独家精品文档,联系QQ:2885784924

许营渡槽设计水利专业-毕业设计(论文).doc

许营渡槽设计水利专业-毕业设计(论文).doc

  1. 1、本文档共63页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
原文: Design the leader Is it draw materials on real project letting camp aqueducting to design originally , let camp aqueduct land muddy irrigated area leap building , Iraq of river of east one trunk canal. The muddy irrigated area of land is one of bigger irrigated areas of Henan Province, the irrigated area is in half a mountain areas and mound mountain range areas, crosses over six counties of three areas in Luoyang , Kaifeng , Zhengzhou, the irrigated area of irrigated area is 57.61 hectares. The whole irrigated area is done the composition of three trunk canals by two total trunk canal and the east one , the east, the west, total length 290.5m, 1134 .32 aqueducts buildings, total length 9.8Km. East one trunk canal plan 3.841 of irrigated area, in the east one irrigated area more for hills arid area, the hillock depression is alternate in the district, the ground is covered for the red and brown clay and loess, hydrogeology is relatively bad, lack the underground source of water . Let camp aqueduct plan axis long 748.1m, this section for being getting mauve, getting reddish brown conglomerate insert sand quality clay, the conglomerate composition is quartz sandstone , quartzite ,etc., the surface is weathered seriously, protruding and concave and not smooth, the naked eye can see the corrosion, the diameter comes in different sizes, there is phenomenon of infiltrating in the hole. Let camp aqueduct larger aqueduct at the east one trunk canal , so to is it concern whole east one trunk canal of planning irrigated areas or not to build up aqueduct this, irrigated area of planning of the muddy irrigated area of the even whole land. Originally designing the rank of the building according to tertiary consideration, it is 80 to design the earthquake intensity. The task originally designed has two items mainly, let geology topographical terms , camp of section according to east one trunk canal , draft two different kinds of leap building pattern of river for the first

您可能关注的文档

文档评论(0)

六神无主 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档