- 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
- 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
- 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
SHT 3904-2015 石油化工建设工程项目竣工验收规定.pdf
巴巴客免费下载标准
ICS 75.010
P 72
备案号:J504-2006
中华人民共和国石油化工行业标准
SH/T 3904—2005
石油化工建设工程项目竣工验收规定
Regulation for acceptance of completed construction projects
in petrochemical industry
2006-01-17 发布 2006-07-01 实施
中华人民共和国国家发展和改革委员会 发 布
巴巴客免费下载标准
巴巴客免费下载标准
SH/T 3904-2005
目 次
前言································································································································································Ⅲ
1 范围····························································································································································· 1
2 规范性引用文件········································································································································· 1
3 术语和定义················································································································································· 1
4 总则·····························································································································································2
5 竣工验收程序与要求·································································································································2
5.1 竣工验收程序··········································································································································2
5.2 交工验收·············
您可能关注的文档
- SHT 3068-1995 石油化工企业钢储罐地基与基础设计规范.pdf
- SHT 3073-2015石油化工管道支吊架设计规范.pdf
- SHT 3088-2015 石油化工塔盘技术规范.pdf
- SHT 3103-2015 石油化工中心化验室设计规范.pdf
- SHT 3156-2015 石油化工离心泵和转子泵用轴封系统工程技术规范.pdf
- SHT 3408-2015 石油化工钢制对焊管件.pdf
- SHT 3410-2015 石油化工锻钢制承插焊和螺纹管件.pdf
- SHT 3507-2015石油化工钢结构工程施工及验收规范.pdf
- SHT 3510-2011石油化工设备溷凝土基础工程施工质量验收规范.pdf
- SHT 3527-2015 石油化工不锈钢复合钢焊接规程.pdf
- 某区纪委书记年度民主生活会“四个带头”个人对照检查材料.docx
- 某县纪委监委2024年工作总结及2025年工作计划.docx
- 某市场监督管理局2024年第四季度意识形态领域风险分析研判报告.docx
- 县委书记履行全面从严治党“第一责任人”职责情况汇报.docx
- 税务局党委书记2024年抓党建工作述职报告.docx
- 某市税务局副局长202X年第一季度“一岗双责”履行情况报告.docx
- 副县长在全县元旦春节前后安全生产和消防安全工作部署会议上的讲话.docx
- 某市委书记个人述职报告.docx
- 某县长在县委常委班子年度民主生活会个人对照检查材料1.docx
- 某县长在县委常委班子年度民主生活会个人对照检查材料.docx
最近下载
- SEW大众培训资料-MOVITRAC 07B变频器参数设置.ppt VIP
- 人音版音乐五年级下册-《铃儿响丁当》课件.pptx
- 国家开放大学电大《政府经济学》期末题库及答案.docx VIP
- SEW教学资料 8MOVITRAC 07B变频器参数设置.ppt VIP
- 简明新疆地方史.pptx VIP
- 2024年高考地理(江苏卷)真题解析课件.pptx
- 苏教版小学数学补充习题一年级上册(31~60页)_图文.pdf VIP
- 国家开放大学期末考试1823《政府经济学》机考试题及答案(第19套).pdf VIP
- SEW学习资料——8MOVITRAC 07B变频器参数设置.ppt VIP
- 《水土保持方案编制项目技术服务方案》.doc VIP
文档评论(0)