- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土木工程桥梁外文翻译--跨越世纪之桥.doc
中文4735字
毕业设计
外文翻译
题 目 跨 越 世 纪 之 桥
专 业 土木工程(桥梁)
2011年6月
A Bridge For All Centuries
An extremely long-and record setting-main span was designed for the second bridge to across the Panama Canal in order to meet the owner’s requirement that no piers be placed in the water.Because no disruption of canal traffic was permitted at any time,the cable-stayed bridge of cast-in-place cancrete was carefully constructed using the balanced-cantilever method.
In 1962 ,the Bridge of Americas(Puente de las America) opened to traffic,serving as the only fixed link across the Panama Canal .The bridge was designed to carry 60,000 vehicles per day on four lanes, but it has beenoperating above its capacity for many years.Toalleviate bottlenecks on the route that the bridge carries over the canal-the Pan-American Highway(Inter-American Highway)-and promotegrowth on the western side of Panama,the country’s Ministry of Public Works(Ministerio de Obras Publicas,or MOP )decided to build a new highway systerm linking the northern part of Panama City,on the eastern side of the canal, to the town of Arraijan,located on the western side of the canal.The Centennial Bridge –named to commemorate 100 years of Panamanian independence-has noe been constructed and, when opend, will carry six lanes of traffic. This cable-stayed bridge of cast-in-place cancrete features a main span of 420m,the longest such span for this type of bridge in the Western Hemisphere.
In 200 the MOP invited international bridge design firms to compete for the design of the crossing, requesting a two-package proposal:one techinical, the other financial. A total of eight proposals were received by December 2000 from established bridge design firms all over the world. After short-listing three firms on the basis of the technical merits of their proposals, the MOP selected T.Y.Lin International, of San Francisco, to prepare the bridge design and provide field construction support based on
您可能关注的文档
- 医疗仪器股份有限公司商业计划书(doc 54页).doc
- 医药流通项目可行性研究报告(pdf 73页).pdf
- 医院信息化平台参考方案-网络.pdf
- 医院可行性研究报告(doc 82页).doc
- 医院改扩建项目可行性研究报告(doc 82页).doc
- 十字路口交通灯的单片机课程设计.doc
- 千岛湖森林游憩园可行性研究报告_送审.doc
- 半环上的具有区间值的直接模糊h-理想_毕业论文(设计).doc
- 半自动气动曲面丝网印刷机项目可研报告.pdf
- 华亭中煦煤化工有限责任公司60万吨_年甲醇项目水土保持方案实施工作总结报告.doc
- 土木工程毕业设计(论文)外文资料翻译.doc
- 土高原地黄区水土保持淤地坝建设内蒙古达拉特旗乌兰斯太沟小流域张源会沟中型淤地坝扩大初步设计.doc
- 地下三层车库地上4栋写字楼模板专项方案.doc
- 地下商业街设计报告.ppt
- 地质环境安全综合评价方法研究可行性报告1.doc
- 场协同原理在强化换热器传热中的应用与分析.pdf
- 垃圾渗滤液处理工程可行性研究报告(doc 94页).doc
- 垫片(BS11-F106)钣金成形工艺及模具设计.doc
- 埃尔斯冰激凌创业计划书执行总结(doc 40页).doc
- 城东县月仙温泉旅游开发项目可行性研究报告(绝对原创)(优秀甲级咨询机构编制).doc
文档评论(0)