网站大量收购独家精品文档,联系QQ:2885784924

道路毕业设计书参考4(重点看挡土墙设计).doc

道路毕业设计书参考4(重点看挡土墙设计).doc

  1. 1、本文档共64页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
摘  要 本毕业设计题目为西藏加查至桑日公路第十三合同段,道路位于雅鲁藏布江流域。路线区域内主要为山岭区,地形起伏较大,设计车速60km/h。设计通过两个方案的比选来确定较佳路线,两个路线全长大概都在三千五百米左右,所选方案二路线全长3544.654m,双向两车道,路基宽10m,路面宽7m。所选沥青路面设计年限12年。 设计包括三个部分,内容如下:第一部分公路线形设计,在本部分,通过认真仔细的研究,结合实际情况,综合考虑了路线填挖平衡、平曲线的优化、平曲线与竖曲线组合原则等,确保了设计线形的优化 整个排水系统由边沟、排水沟组成;;; Abstract The design is the tenth contract section from Qachas to Mulberry Day in Tibet, and the road is located in the Brahmaputra river basin . In the route region, there is mainly mountain ridge area, and the hypsography is series, so the design speed is 60km/h. The better route is determined through comparing of two program in the design. The length both are probably about 3,500 meters, and the selected program is 3544.654m, two two-way lanes, and the widen of the roadbed is 10m,7m of the pavement. Asphalt cement concrete pavement is designed for twelve years. The design includes three parts, as follows : The road technical road linear design: In this part, through careful review, in light of the actual situation, the author considering the balance of excavation, the optimization of plane curve, the combination of plane curve and vertical curve, to ensure that the design of linear optimization. Then a more reasonable program -- the second program are recommended through comparing the two program according to the technical economic indicator. The second part is the roadbed engineering design, which includ retaining engineering design and so on. Part three is pavement design, and the concrete pavement and asphalt cement concrete pavement both are considered and designed competely in the design, asphalt concrete pavement is recommended for the program, the whole drainage system is formed as side ditches, drainage ditch and pipe culvert. Related to the drawings, forms attached. Key words : Route plane linear design; Vertical section design; Cross-section design; gravity retaining walls;avement design 目 录 绪论 1 1 毕业设计任务书 3 1.1 设计基本资料 3 1.1.1 道路的性质与任务 3 1.1.2 道路等级 3 1.1.3 沿线自然地理特征 3 1.2 设计的

文档评论(0)

sxty + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档