2011年国家科学技术进步奖初评答辩材料 - rksi.org.ppt

2011年国家科学技术进步奖初评答辩材料 - rksi.org.ppt

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Endeavor in efficiency and security, we buildup a system of standard procedures. Decompose the operation business into independent tasks, then establish standard business procedures for every task in details. E.g. switching operation, combined monitoring, and joint fault dispose, etc. * Overview of SGCC and the Integration of Large Wind Power 国家电网概况及大规模风电并网运行情况 National Electric Power Dispatching and Control center State Grid Corporation of China September , 2013 国家电力调度控制中心 中国国家电网公司 2013.09 Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development Bank (ADB), its Board of Directors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this document, and accept no responsibility for any consequence of their use. By making any designation or reference to a particular territory or geographical area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area. 2. Integration and Operation of Large Wind Power 大规模风电并网运行 Overview of SGCC 国网概况 3. Problems We Have Interests in 下一步工作展望 19 Overview of SGCC 国网概况 SGCC’s core business is to build and operate power grids, the service area covers 26 of 31 provinces, takes 88% of China’s territory, SGCC is the biggest utility company worldwide. 作为世界上最大的公用事业企业,国家电网主营业务是建设和运行26个省级电网,经营范围覆盖了国土面积的88%。 (unit GW) The steady growth of China’s national economy leads to the continuous increase of electricity demand and installed capacity at a fast speed. By the end of 2012, total installed capacity and gross generation reached 882GW and 3876TWh respectively. The first is thermal power, takes 74% and the second is hydro power, takes 19%.The wind power increased fast and exceeded 56GW, takes 6.3%. Installed Capacity 装机容量 得益于中国经济的稳定增长,社会用电需求和发电装机容量快速增长。2012年底,国网经营区域内发电装机容量达到8.82亿千瓦时,其中火电占74%,水电19%,风电装机5636万千瓦,占

文档评论(0)

神话 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:5203223011000000

1亿VIP精品文档

相关文档