- 1、本文档共18页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《2016 A distributed shifting bottleneck heuristic for complex job shops》.pdf
Computers Industrial Engineering 49 (2005) 363–380
/locate/dsw
A distributed shifting bottleneck heuristic for complex job shops*
¨ a,* ´ b
Lars Monch , Rene Drießel
aInstitute of Information Systems, Technical University of Ilmenau, Helmholtzplatz 3, 98684 Ilmenau, Germany
bX-CASE GmbH, Albert Einstein Str. 3, 98684 Ilmenau, Germany
Received 20 October 2004; revised 13 May 2005; accepted 6 June 2005
Available online 12 September 2005
Abstract
In this paper, we consider distributed versions of a modified shifting bottleneck heuristic for complex job shops.
The considered job shop environment contains parallel batching machines, machines with sequence-dependent
setup times and reentrant process flows. Semiconductor wafer fabrication facilities are typical examples for
manufacturing systems with these characteristics. The used performance measure is total weighted tardiness
(TWT). We suggest a two-layer hierarchical approach in order to decompose the overall scheduling problem. The
upper (or top) layer works on an aggregated model. Based on appropriately aggregated routes it determines start
dates and planned due dates for the jobs within each single work area, where a work area is defined as a set of
parallel machine groups. The lower (or base) layer uses the start dates and planned due dates in order to apply
shifting bottleneck heuristic type solution approaches for the jobs in each single work area. We conduct simulation
experiments in a dynamic job shop environment in order to assess the performance of the heuristic. It turns out
您可能关注的文档
- 《110ftp》.pdf
- 《111-LED灯杯应用手册大全—(CPL灯杯公司内部资料)》.pdf
- 《1121 Leif Norell》.pdf
- 《1121JAVA基础教程笔记》.doc
- 《1155_Synthesis-of-powders-and-films-using-a-new-laser-ablation-technique》.pdf
- 《1157-5BL-SOPLED车灯实际的作业标准书》.xls
- 《11乡土式微Ill_Fares_the_Land》.pdf
- 《12 Allowable received OTDR light power for in-service measurement in lightwave SCM systems》.pdf
- 《12 Coherent Control of Single-Photon Absorption and Reemission in a Two-Level Atomic Ensemble》.pdf
- 《12 java2实用教程(第三版)第十二章》.ppt
- 《2016 A fast heuristic algorithm for solving parallel-machine job-shop scheduling problems》.pdf
- 《2016 A filter-and-fan approach to the job shop scheduling problem》.pdf
- 《2016 A filtered-beam-search-based heuristic algorithm for flexible job-shop scheduling problem》.pdf
- 《2016 A fluid approach to job shop scheduling - theory》.pdf
- 《2016 A fluid approach to large volume job shop scheduling》.pdf
- 《2016 A general approach for optimizing regular criteria in the job-shop scheduling problem》.pdf
- 《2016 A heuristic algorithm for solving flexible job shop scheduling problem》.pdf
- 《2016 A Hybrid Cascaded Multi-level Converter for Power Storage System》.pdf
- 《2016 A hybrid harmony search algorithm for the flexible job shop scheduling problem》.pdf
- 《2016 A hybrid single and dual population search procedure for the job shop scheduling problem》.pdf
文档评论(0)