《2016 Changes in the Planning and Control System during Implementation of Lean Production》.pdf
- 1、本文档共16页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《2016 Changes in the Planning and Control System during Implementation of Lean Production》.pdf
Changes in the Planning and
Control System during
Implementation of Lean
Production.
Peter Olsson and Mats I. Johansson
Chalmers University of Technology,
Division of Logistics and transport
SE-412 96 Göteborg, Sweden.
Abstract
Many companies now rapidly try to adopt the philosophy and tools of lean
production to improve their production performances. Many parts of the
companies are affected by such a transition and it has a clear positive influence
on the materials flow. The aim is to identify the required changes of the
manufacturing planning and control system while moving towards lean. The
paper first presents a theoretical background after which, empirical findings
from two Swedish companies are presented. The study shows a number of
examples where the planning system ought to be aligned to a transition in
direction towards lean, but also that the present planning system in no way is
hindering the start of a lean implementation.
1. Introduction
Many companies now rapidly try to adopt the philosophy and tools of lean
production to improve their production performances. Many parts of the
companies are affected by such a transition from their traditional way of
working to a system characterized by a focus on customer needs, on producing
179
in small batches at the same rate as the customer demand, and on continuous
improvements in order to reduce waste.
Lean tools have a clear positive influence on the materials flow in terms of, e.g.,
lead time, visibility, inventory levels and work in progress and, especially at the
detailed planning levels, greatly simplify the planning and control process. The
manufacturing planning and control (MPC) system, inc
您可能关注的文档
- 《1988level set》.pdf
- 《1990 B A real snow job》.pdf
- 《1990 Scheduling jobs with simple precedence constraints on parallel machines》.pdf
- 《1991 A branch and bound algorithm for job-shop scheduling》.pdf
- 《1992 An integrated model for job-shop planning and scheduling》.pdf
- 《1993 A practical approach to job-shop scheduling problems》.pdf
- 《1993 An efficient dynamic dispatching rule for scheduling in a job shop》.pdf
- 《1994 A branch and bound algorithm for the job-shop scheduling problem》.pdf
- 《1994 Adjustments of heads and tails for the job-shop problem》.pdf
- 《1994 The job-shop problem and immediate selection》.pdf
- 高速公路物流运输需求.pptx
- 考点解析-北师大版8年级数学上册期中试题附参考答案详解【A卷】.docx
- 2025-2030中国没药市场发展分析及市场趋势与投资方向研究报告.docx
- 2025年乡村医生考试题库:农村医疗卫生机构管理医疗管理医疗纠纷处理试题.docx
- 考点解析-北师大版8年级数学上册期中试题含答案详解【实用】.docx
- 房地产中介聘用合同8篇.docx
- 2025-2030中国沟通与协作行业市场发展趋势与前景展望战略研究报告.docx
- 2025年注册税务师税法二重点难点试卷.docx
- 2025-2030中国沙龙家具行业市场发展趋势与前景展望战略研究报告.docx
- 高速铁路建设对城市发展的影响.pptx
最近下载
- 感恩主题班会课件《感谢有你一路同行》.pptx
- 美年健康2023年度健康体检大数据蓝皮书.pdf
- (安卓手机QQ聊天记录查看恢复助手使用图文教程.docx VIP
- 【高中化学】过渡晶体和混合型晶体【第三课时】2022-2023学年高二化学同步课件(人教版2019选择性必修二).pptx VIP
- 医疗纠纷应对与处理教学课件_图文并茂.ppt VIP
- 起重吊装安全作业业务流程图.docx VIP
- 广东工业大学20200709《电力系统继电保护》试卷.pdf
- DB4403_T 371-2023 社区健康服务机构中医药工作规范.docx
- 河北省社会科学基金项目申请书.docx
- 第10课《和谐校园 共同维护》第2框《筑牢心灵的防火墙》-【中职专用】《心理健康与职业生涯》同步课堂精品课件.pptx
文档评论(0)