《2016 Changes in the Planning and Control System during Implementation of Lean Production》.pdf
- 1、本文档共16页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《2016 Changes in the Planning and Control System during Implementation of Lean Production》.pdf
Changes in the Planning and
Control System during
Implementation of Lean
Production.
Peter Olsson and Mats I. Johansson
Chalmers University of Technology,
Division of Logistics and transport
SE-412 96 Göteborg, Sweden.
Abstract
Many companies now rapidly try to adopt the philosophy and tools of lean
production to improve their production performances. Many parts of the
companies are affected by such a transition and it has a clear positive influence
on the materials flow. The aim is to identify the required changes of the
manufacturing planning and control system while moving towards lean. The
paper first presents a theoretical background after which, empirical findings
from two Swedish companies are presented. The study shows a number of
examples where the planning system ought to be aligned to a transition in
direction towards lean, but also that the present planning system in no way is
hindering the start of a lean implementation.
1. Introduction
Many companies now rapidly try to adopt the philosophy and tools of lean
production to improve their production performances. Many parts of the
companies are affected by such a transition from their traditional way of
working to a system characterized by a focus on customer needs, on producing
179
in small batches at the same rate as the customer demand, and on continuous
improvements in order to reduce waste.
Lean tools have a clear positive influence on the materials flow in terms of, e.g.,
lead time, visibility, inventory levels and work in progress and, especially at the
detailed planning levels, greatly simplify the planning and control process. The
manufacturing planning and control (MPC) system, inc
您可能关注的文档
- 《1988level set》.pdf
- 《1990 B A real snow job》.pdf
- 《1990 Scheduling jobs with simple precedence constraints on parallel machines》.pdf
- 《1991 A branch and bound algorithm for job-shop scheduling》.pdf
- 《1992 An integrated model for job-shop planning and scheduling》.pdf
- 《1993 A practical approach to job-shop scheduling problems》.pdf
- 《1993 An efficient dynamic dispatching rule for scheduling in a job shop》.pdf
- 《1994 A branch and bound algorithm for the job-shop scheduling problem》.pdf
- 《1994 Adjustments of heads and tails for the job-shop problem》.pdf
- 《1994 The job-shop problem and immediate selection》.pdf
- 书面表达之建议信(讲义)-中考英语一轮复习(含答案).pdf
- 中考历史复习小众题型类:填空题、改错题、判断题(70题).pdf
- 2024年吉林省县乡教师选调考试《教育学》真题汇编带解析必背【基础题】.pdf
- 2025年中考语文备考之《朝花夕拾》名著导读及考题.pdf
- 小说标题的含义和作用(模拟突破)-2025年中考语文考点突破之小说阅读(解析版).pdf
- 阅读理解之应用文(练习)-中考英语一轮复习(含答案).pdf
- 小说情节作用(模拟突破)-2025年中考语文考点突破之小说阅读(原卷版).pdf
- 小说段落作用(模拟突破)-2025年中考语文考点突破之小说阅读(解析版).pdf
- 小说段落作用(试题专练)-2025年中考语文考点突破之小说阅读(解析版).pdf
- 2025年上海市16区初三语文一模试题汇编之现代文阅读二(记叙文)学生版.pdf
最近下载
- 2025年八省联考山西陕西宁夏青海高考化学试卷(含答案解析).docx
- 一元二次方程的解法——配方法ppt省公开课获奖课件说课比赛一等奖课件.pptx
- 国家及行业标准_J-B_T 5285-2008 真空净油机.pdf
- 必威体育精装版通用BIQS审核检查表中英文版.xlsx
- 老年学概论(第3版) 第十二章.ppt VIP
- 卫生部临床路径全部病种目录(含病种名称、ICD码及文件号)--吐血整理.pdf VIP
- 大学考试试卷《安全监测监控技术》及参考答案.doc VIP
- 全国性行业协会商会参考名单.pdf
- 公司基本情况介绍范文(二篇).pdf
- 某市人大2024年贯彻落实中央八项规定精神情况报告.docx VIP
文档评论(0)