- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《2016 Lagrangian relaxation for complex job shop scheduling》.pdf
Proceedings of the 2006 IEEE International Conference on Robotics and Automation
Orlando, Florida - May 2006
Lagrangian Relaxation for Complex Job Shop Scheduling
Tao Sun Peter B. Luh Min Liu
Center for Intelligent and Networked Center for Intelligent and Networked Department of Automation,
Systems, Department of Automation Systems, Department of Automation Tsinghua University, Beijing 100084,
Tsinghua University, Beijing 100084, Tsinghua University, Beijing, China China
China Department of Electrical and Computer liumin@cims.tsinghua.edu.cn
suntao99@mails.tsinghua.edu.cn Engineering
University of Connecticut, Storrs, USA
Abstract – Market competition forces manufactures to
schedule their resources efficiently for on-time order delivery
and low inventory. However, for companies such as textile and
steel-making companies, optimizing schedules is difficult because
of the NP-hard nature of the problem and the complex product
structures: assemblies, disassemblies and couplings across
orders. To address the difficulties, this paper extends the
Lagrangian relaxation approach through selectively relaxing
precedence constraints. The solution oscillation is identified and
alleviated by adding auxiliary penalty and by nonlinear
approximation. Furthermore, the normalized surrogate Fig. 1 A two-order scheduling problem with complex structures.
subgradient method is developed
您可能关注的文档
- 《1998 Branch and Bound methods for the multi-processor job shop and flow shop scheduling problems》.pdf
- 《1998 Efficient Lagrangian relaxation algorithms for industry size job-shop scheduling problems》.pdf
- 《1998 Job shop scheduling with group-dependent setups》.pdf
- 《1998 minimizing job tardiness - prority rules vs adaptive scheduling》.pdf
- 《1998 Minimizing tardy jobs in a two-stage hybrid flowshop》.pdf
- 《1998 Reduction of job-shop problems to flow-shop problems with precedence constraints》.pdf
- 《1999 An effective approach for job-shop scheduling with uncertain processing requirements》.pdf
- 《1999 Convergence of a simple subgradient level method》.pdf
- 《1999 Lagrangian Relaxation Neural Networks for Job Shop Scheduling》.doc
- 《1999 Light on a lattice》.pdf
- 吉安县公开招聘专职文明实践员笔试备考试题及答案解析.docx
- 2025重庆枫叶国际学校招聘教师笔试备考试题及答案解析.docx
- 游机队电玩自制联网教程-tplink.pdf
- 2025重庆新华出版集团招聘1人笔试模拟试题及答案解析.docx
- 2025宜宾高新丽雅城市产业发展有限公司公开招聘笔试模拟试题及答案解析.docx
- 2025云南保山市龙陵县勐糯镇人民政府招聘合同制专职消防员1人笔试模拟试题及答案解析.docx
- 11.1生活中常见的盐 九年级化学人教版下册.pptx
- 6.1法律保护下的婚姻 高二政治《法律与生活》课件(统编版选择性必修2)(新版).pptx
- 文昌市中小学教师校园招聘29人笔试模拟试题及答案解析.docx
- 10.1.5 常见的酸和碱(第5课时)课件-九年级化学人教版下册.pptx
最近下载
- 五年级上册数学试题-期末测试卷人教版(含答案).docx VIP
- 某智慧交通与智慧城管PPP项目建设项目智慧城市下阶段发展建议书.doc VIP
- 智慧城市建设(智慧交通与智慧城管)PPP项目-技术标书.docx VIP
- 湖北省“腾云”联盟2024-2025学年高三上学期8月联考物理试卷含答案.pdf
- 广州数控GSK980TDc车床CNC数控系统使用手册.pdf
- 高中高考数学所有二级结论《完整版》.docx VIP
- 湖北省腾云联盟2024-2025学年高三上学期12月联考物理试卷含答案.docx VIP
- 药液外渗的应急预案及处理PPT.pptx VIP
- 智能交通系统标准体系结构.doc VIP
- 平安产险内蒙古自治区商业性奶牛养殖保险条款.docx VIP
文档评论(0)