- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《2016 Mathematical Models of Flow Shop and Job Shop Scheduling Problems》.pdf
World Academy of Science, Engineering and Technology 31 2007
Mathematical Models of Flow Shop and Job
Shop Scheduling Problems
Miloš Šeda
approximation and heuristic approaches (including tabu
Abstract—In this paper, mathematical models for permutation search, simulated annealing, genetic algorithms, and ejection
flow shop scheduling and job shop scheduling problems are chains) to scheduling manufacturing processes are presented
proposed. The first problem is based on a mixed integer and discussed in [3].
programming model. As the problem is NP-complete, this model can In [11], a case with uncertain processing times is studied
only be used for smaller instances where an optimal solution can be
computed. For large instances, another model is proposed which is and an approach based on fuzzy set theory is proposed. The
suitable for solving the problem by stochastic heuristic methods. For problem has some other modifications, e.g. a no-wait
the job shop scheduling problem, a mathematical model and its main version in which the start of job processing is delayed on the
representation schemes are presented. first machine so that the job need not wait for processing on
subsequent machines. In this paper, we deal with another
Keywords—Flow shop, job shop, mixed integer model,
您可能关注的文档
- 《1999 Lagrangian Relaxation Neural Networks for Job Shop Scheduling》.doc
- 《1999 Light on a lattice》.pdf
- 《1999 The Efficiency of Ballstep Subgradient Level Methods for Convex Optimization》.pdf
- 《1DT3001A DT3001B 4Channels AC LED Driver IC datasheet》.pdf
- 《1Java 网络编程1》.pdf
- 《1java语言概述》.ppt
- 《1ps passively modelocked laser operation》.pdf
- 《1st_Lesson_All》.pdf
- 《1大功率led路灯散热方案的研究》.pdf
- 《1辑《Super_Junior_05》歌词-中韩音译3对照》.doc
- 《2016 Mixed binary integer programming formulations for the reentrant job shop scheduling problem》.pdf
- 《2016 Modular design of a hybrid genetic algorithm for a flexible job–shop scheduling problem》.pdf
- 《2016 Multi-instance multi-label learning with application to scene classification》.pdf
- 《2016 New Challenges of Parallel Job Scheduling》.pdf
- 《2016 On the identical parallel-machine rescheduling with job rework disruption 》.pdf
- 《2016 Parallel machine scheduling with splitting jobs》.pdf
- 《2016 Predictive–reactive scheduling on a single resource with uncertain future jobs》.pdf
- 《2016 Rescheduling problems with deteriorating jobs under disruptions》.pdf
- 《2016 Review on Job-Shop and Flow-Shop Scheduling using Multi Criteria Decision Making》.pdf
- 《2016 Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops》.pdf
文档评论(0)