网站大量收购独家精品文档,联系QQ:2885784924

《2016 Review on Job-Shop and Flow-Shop Scheduling using Multi Criteria Decision Making》.pdf

《2016 Review on Job-Shop and Flow-Shop Scheduling using Multi Criteria Decision Making》.pdf

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《2016 Review on Job-Shop and Flow-Shop Scheduling using Multi Criteria Decision Making》.pdf

Review on Job-Shop and Flow-Shop Scheduling using Multi Criteria Decision Making 130 REVIEW ON JOB-SHOP AND FLOW-SHOP SCHEDULING USING MULTI CRITERIA DECISION MAKING Sultana Parveen* and Hafiz Ullah Department of Industrial and Production Engineering Bangladesh University of Engineering and Technology, Dhaka-1000, Bangladesh *Corresponding email: sparveen@ipe.buet.ac.bd Abstract: Scheduling is widely studied and complex combinatorial optimization problems. A vast amount of research has been performed in this particular area to effectively schedule jobs for various objectives. The multi-criteria scheduling problem is one of the main research subjects in the field of modern manufacturing where most of them are considered as NP-hard. This paper discusses the more recent literature on scheduling using multi criteria decision making (MCDM). This article addresses both job-shop and flow-shop scheduling problem. Key Words: Flow-shop scheduling, Genetic algorithms, Job-shop scheduling, Multi-objective optimization. INTRODUCTION Flow-shop Scheduling Scheduling is broadly defined as the process of A flow-shop is a shop design in which machines assigning a set of tasks to resources over a period of are arranged in series Jobs begin processing on an time1 or it may be defined as ‘‘the allocation of initial machine, proceed through several intermediary resources over time to perform a collection of machines, and conclude on a final machine3. The tasks’’2 . Scheduling problems

文档评论(0)

wgvi + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档