OGDCL PROJECT
KPD – TAY Integrated Development Project Phase-II
PROC-FC/CB/PROJ-667/767321/2013
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, CONSTRUCTION COMMISSIONING OF AMINE SWEETENING, LPG CONDENSATE STABILIZATION UNITS, POWER GENERATION PACKAGE, SALES GAS METERING SKID, HOT OIL SYSTEM AND OTHER RELATED UTILITIES
CONTENTS
1. Basis of Preparation 1
2. Overview of the Project 1
3. The conditions available before lifting 3
4. Technical Preparation and Calculation 4
4.1. Crane Preparation and Calculation 4
4.2. Slings Preparation and Calculation 5
4.3. Spreader Beam Preparation and Calculation 7
4.4. Layout and Leveling for Site Lifting 11
4.5. Foundation Treatment 12
4.6. Foundation Treatment and Acceptance 14
4.7. Equipment Entering the Site 15
4.8. Checking Lifting Eye 15
4.9. Equipment Anchor Bolt Treatment and Sizing Block Placing 16
5. The Entry Route for Heavy Cranes and Heavy Equipments 18
6. Cranes’ Layout after Entering the Site 19
7. Lifting Schedule and Sequence 24
8. Equipment Lifting 24
9. Secondary Crane Lifting Weight 29
10. Loosen Slings and Equipment Unhook 30
11. Equipment Installation Methods and Technical Requirements 30
12. Organization Chart for Quality and Safety Assurance 32
13. Table 13 for construction machines, tools and auxiliary materials 35
14. Table 14 for staff plan 37
Attached:
The Load Chart for 250 ton Crane and 600 ton Crane
The Risk Analysis of Heavy Duty Equipments Hoisting and Its Precautions
Basis of Preparation
Equipment Layout Plan and Equipment Assembly Drawings for Gas Processing Facility Proj-667 Pakistan
Lifting Manual
Load Charts for Cranes
GB50231-2009
GB150-2011
Overview of the Project
Project Features
The heavy equipments of the project are mainly focused on Package AB with a close layout, a narrow placing space and a high altitude. There are pipe racks, skids, other equipment and structure foundation around the columns. Lifting radius is large so a small crane is unable to meet the requirements of instal
您可能关注的文档
- “营改增”对建筑施工企业的影响与应对.ppt
- 《水质工程》设计说明书.doc
- 51单片机的结构与原理.ppt
- XXX工程施工临电方案(修改版).doc
- XXX工程施工组织设计(地上部分).doc
- XXX小型砌块填充墙砌体工程施工方案.doc
- 保暖内衣与羽绒服商品知识.ppt
- 北京地铁六号线二期13标盾构吊装、解体作业专项方案.doc
- 电气试验原理及常规设备试验.ppt
- 电商“三国杀”变“两阵营”血拼日变狂欢节拼价拼晚会.pdf
- 某县纪委监委开展“校园餐”突出问题专项整治工作汇报22.docx
- 中小学校园食品安全与膳食经费管理专项整治工作自查报告66.docx
- 某县委常委、宣传部部长年度民主生活会“四个带头”个人对照检查发言材料.docx
- XX县委领导班子年度述职述廉报告3.docx
- 某县纪委关于校园餐问题整治工作落实情况的报告.docx
- 中小学校园食品安全与膳食经费管理专项整治工作自查报告22.docx
- 某县税务局党委领导班子年度民主生活会“四个带头”对照检查材料.docx
- 某县委书记在县委常委班子年度民主生活会专题学习会上的讲话.docx
- 某县纪委校园餐问题整治工作落实情况的报告.docx
- 某区委副书记、区长年度民主生活会对照检查材料.docx
文档评论(0)