管道支吊架安装说明(英文).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
管道支吊架安装说明(英文)

Installation and Operation of Piping Support and Hanger Maintenance Manual Jiangyin Yanxin Petrochemical Electric Power Machinery Factory Address : Xiqiao Industrial Zone, Jiangyin City, Jiangsu Province, 214426, P. R. China Tel : +86 510 8612 4888 or 8612 5788 Fax : +86 510 8612 9000 E-mail : gyfd2000@citiz.net Content Foreword Rigid Hanger Rigid Support Variable Spring Support and Hanger Constant Spring Support and Hanger Adjustment of Spring Support and Hanger Operation Supervision and Maintenance Typical Structural Drawing for Variable Spring Support and Hanger Typical Assembly Drawing for Variable Spring Support and Hanger Typical Assembly Drawing for Constant Spring Support and Hanger Foreword The installation of Piping Support and Hanger is the final and critical step regarding to the whole design of Piping Support and Hanger. It determines that whether the piping and related equipments can be in safe operation for a long time. The basic requirements for installation of Piping Support and Hanger are as following: Installation as per Drawings Accurate Adjustment Strict Inspection “Installation as per Drawings” means that the selection of types, sizes, specifications and materials for Support and Hanger and its attachments and the position, installation and adjustment for Support and Hanger shall be in strict accordance with the Assembly Drawing, the Type Drawing, the Detail Drawing and the Installation Guidance. “Accurate Adjustment” means that detailed adjustment of positions, connections and loads etc. for Support and Hanger and its attachments shall be done as per design drawings and related technical specifications after installation. “Strict Inspection” means that the quality of attachments and materials of Support and Hanger shall be accepted before installation and each Support and Hanger and its attachments shall be carefully checked and recorded after installation, after hydraulic testing or during operation. The springs mentioned in this man

文档评论(0)

haodoc + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档