物流运输概述精要.ppt

  1. 1、本文档共77页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
物流运输概述精要.ppt

Bill of Materials (BOM) File A Complete Product Description BOM文件包含完整的产品说明、不止罗列 了物料、零件与配件,还罗列了产品生产 的顺序。 输入MRP程序的三个主要来源: BOM文件 主生产计划 库存记录文件 A产品的物料清单(产品结构树) B(4) E(1) D(2) C(2) F(2) D(3) A 例子:圆珠笔产品结构树 园珠笔 笔芯 笔筒 笔油墨 笔芯头 笔芯杆 笔帽 Example of MRP Logic and Product Structure Tree U(2) X(2) W(1) V(3) Y(2) W(2) T Product Structure Tree for Assembly A Lead Times T 1 week U 2 weeks V 2 weeks W 3 weeks X 1 week Y 1week Given the product structure tree for “A” and the lead time and demand information below, provide a materials requirements plan that defines the number of units of each component and when they will be needed 7周内完成100单位产品的MRP The McGraw-Hill Companies, Inc., 2006 * Example of MRP Logic and Product Structure Tree B(4) E(1) D(2) C(2) F(2) D(3) A Product Structure Tree for Assembly A Lead Times A 1 day B 2 days C 1 day D 3 days E 4 days F 1 day Total Unit Demand Day 10 50 A Day 8 20 B (Spares) Day 6 15 D (Spares) Given the product structure tree for “A” and the lead time and demand information below, provide a materials requirements plan that defines the number of units of each component and when they will be needed LT = 1 day First, the number of units of “A” are scheduled backwards to allow for their lead time. So, in the materials requirement plan below, we have to place an order for 50 units of “A” on the 9th day to receive them on day 10. Next, we need to start scheduling the components that make up “A”. In the case of component “B” we need 4 B’s for each A. Since we need 50 A’s, that means 200 B’s. And again, we back the schedule up for the necessary 2 days of lead time. B(4) E(1) D(2) C(2) F(2) D(3) A Spares LT = 2 4x50=200 B(4) E(1) D(2) C(2) F(2) D(3) A Part D: Day 6 Finally, repeating the process for all components, we have the final materials requirements plan: The McGraw-Hill Companies, Inc., 2006 * B(4) E(1) D(2) C(2) F(2) D(3) A 40 + 15 spares Part D: Day 6 Finally, repeating the process for all components, we have the final material

文档评论(0)

love + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档