- 1、本文档共35页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* Fatal Facts A 22-year-old carpenter’s apprentice was killed when he was struck in the head by a nail fired from a powder-actuated nail gun. The nail gun operator fired the gun while attempting to anchor a plywood concrete form, causing the nail to pass through the hollow form. The nail traveled 27 feet before striking the victim. The nail gun operator had never received training on how to use the tool, and none of the employees in the area was wearing PPE. In another situation, two workers were building a wall while remodeling a house. One of the workers was killed when he was struck by a nail fired from a powder-actuated nail gun. The tool operator who fired the nail was trying to attach a piece of plywood to a wooden stud. But the nail shot though the plywood and stud, striking the victim. Below are some OSHA regulations that should have been followed. ? Employees using powder- or pressure-actuated tools must be trained to use them safely. ? Employees who operate powder- or pressure-actuated tools must be trained to avoid firing into easily penetrated materials (like plywood). ? In areas where workers could be exposed to flying nails, appropriate PPE must be used. * 1926.302(e)(8) * * 1926.305(d)(1)(iii), 1926.305(d)(1)(iv) Inspect jacks according to this schedule: (1) for jacks used continuously or intermittently at one site - at least once every 6 months, (2) for jacks sent out of the shop for special work - inspect when sent out and inspect when returned (3) for jacks subjected to abnormal loads or shock - inspect before use and immediately thereafter. * 1926.305(a)(1) * 1926.305 (c), 1926.305(d)(1) When it is necessary to provide a firm foundation, block or crib the base of the jack. Where there is a possibility of slippage of the metal cap of the jack, place a a wood block between the cap and the load. * Construction Safety Training --AFS * 千斤顶Jacks 放置千斤顶,保证: To set up a jack, ensure: 基础坚硬水平 The base is on a firm, level surface 放置在中心
您可能关注的文档
- 三级安全教育教案解析.ppt
- 世界级城市综合体的深入研究日本难波公园教案解析.ppt
- 三级第三单元四边形教案解析.ppt
- 世界经济传导机制教案解析.ppt
- 三级教育之厂级教育教案解析.ppt
- 世界经济危机高考历史总复习教案解析.ppt
- 三级科学下册安全用电青岛版教案解析.ppt
- 三级上册练习教案解析.ppt
- 三级上册语文第六单元习作风景优美的地方教案解析.ppt
- 世界康复大会教案解析.ppt
- 2025江浙沪居民睡眠健康小调研报告.pdf
- 毕业论文的开题报告范文.docx
- 团委活动方案(拓展).docx
- 汽车智能驾驶行业深度报告:端到端与AI共振,智驾平权开启新时代.pdf
- 小核酸行业深度:技术平台和适应症不断验证,迎来销售和临床密集兑现期-华福证券-2025.3.31-65页.docx
- 医药生物行业医疗AI专题报告二多组学篇AI技术驱动精准诊断实现重要突破-25031440页.docx
- CXO行业系列报告三寒冬已过行业需求逐步回暖-25031430页.docx
- 全国租赁市场报告2025年3月_可有哪些信誉好的足球投注网站.pdf
- 玩具行业“情绪经济”专题:创新玩法+IP赋能,重新定义玩具-华鑫证券-2025.docx
- 医疗保健行业PCAB抑制剂药物深度报告抑酸药物市场空间广阔PCAB抑制剂大有可为-25.pdf
文档评论(0)