道路工程(专业英语).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
道路工程(专业英语)

Road works Roads resulting from human activities associated with,And to promote social progress and development,Is a symbol of history and civilization、A sign of scientific progress,The original road is formed by people trampling trails。After the requirements have a better road,Borrow pit fill,Frame wood across the river to Easy access。 Mid-18th century,Modern road construction began in Europe the rise. In 1747 the first bridge to establish the school in Paris. Teresa French P.-M.-J. cover、British Mark T. Telford and J.L. when other Engineers propose a new pavement structure theory and practice, Laid the foundation of modern road construction. 1883 - 1885 Germany G.W. Daimler、C.F. Benz invented the car,Created by automobile traffic and new road works in the modern era. 1931 ~ 1942, Germany built the highway network, Provides for the automotive traffic safety, speed, economy, comfort driving conditions. Subgrade Roadbed is the main route, is the basis of the road and the vehicle load and road surface to bear. Its cross-section of embankment fill and cut into the embankment-type situation, cutting style, half-filled and half-dug-style categories. Shoulder on both sides of the rembankment is within the zone edge for supporting the road, parked vehicles or for temporary pedestrian use. Earthwork embankment into difficulty by excavation earthworks(Cultivation, ordinary soil, hard soil three) and Rock Engineering (soft rock, hard rock times, hard rock three). Subgrade in road construction, Large projects, covering a wide,Often the key to control the construction schedule, So requirements:① as far as possible along with a combination of irrigation and water conservancy construction and strive to save space; ② in accordance with standard design, strict control of construction quality, to ensure sufficient strength and roadbed stability; ③ strengthening works to improve drainage and protection, along the river embankment should be careful not to be destroyed by flood; ④ fi

文档评论(0)

cuotian + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档