- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* The goal if to have no more than 4-5 F temperature variation within 1 hr. Repeated variations of temperature of 4-5 F within short periods of time result in reduction in gain and increased opportunities for health challenges. However, gradual changes in temperature (such as cooling down 6-10 F at night and heating to recommended temperature beginning at 6-7 am) have been demonstrated to actually increase feed intake and daily gain if these begin 1 week after weaning. * * Typical dimensions of a tunnel room/barn. * An example of how tunnel barns are designed. Use the larger of the 2 values. * Example of why there is a minimum size to a tunnel barn. If there is an 8 ft ceiling, to get 300 fpm for a 41 ft wide barn, you need a minimum of 96,00 CFM regardless of the number of pigs. For a 1000 hd barn, you need 120,000 CFM to meet the 120 CFM design criteria for temperature removal. For a 1000 hd barn, the cross sectional velocity is 375 ft/min. If you had 1200 pigs in a 41 ft wide barn, the cross sectional velocity would go up to 450 ft/min at 120 cfm/pig. This illustrates why there is an upper limit to length (pig numbers per room) with tunnel ventilation. * Example of why there is a minimum size to a tunnel barn. If there is an 8 ft ceiling, to get 300 fpm for a 41 ft wide barn, you need a minimum of 96,00 CFM regardless of the number of pigs. For a 1000 hd barn, you need 120,000 CFM to meet the 120 CFM design criteria for temperature removal. For a 1000 hd barn, the cross sectional velocity is 375 ft/min. If you had 1200 pigs in a 41 ft wide barn, the cross sectional velocity would go up to 450 ft/min at 120 cfm/pig. This illustrates why there is an upper limit to length (pig numbers per room) with tunnel ventilation. * * * * * * * * * * * Fans tilted downward 15 degrees. Note that fans blow across the building (S to N). Idea is to force hot air out of building (N side) on calm days. Downward tilt increases air flow in pig zone. Note also the low stem wall – a
您可能关注的文档
最近下载
- 电力市场交易软件:Energy Exemplar PLEXOS二次开发_7.运行模拟与案例分析.docx VIP
- 煤矿新技术新工艺新设备和新材料课件课件.ppt VIP
- Starter Unit 3 Welcome! (单元解读课件)七年级英语上册(人教版2024).ppt
- 初中七年级(下册) 语文文言文阅读训练试题整理含答案.pdf VIP
- 05N5 热力工程(工程图集).docx VIP
- 电力系统优化与调度软件:PLEXOS二次开发_(16).电力系统规划与运营.docx VIP
- 电力市场分析软件:PLEXOS二次开发_(2).电力市场建模基础.docx VIP
- PCS7-DOSE块使用方法详解.pdf VIP
- 电力系统优化与调度软件:PLEXOS二次开发_(4).电力系统优化理论.docx VIP
- KSFWAY知识竞赛试题含答案.doc VIP
文档评论(0)