网站大量收购独家精品文档,联系QQ:2885784924

双阴山公路隧道设计-土木毕业设计.doc

  1. 1、本文档共112页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
本科学生毕业设计 双阴山公路隧道设计 系部名称: 土木与建筑工程学院 专业班级: 土木工程(岩土)10-2班 学生姓名: 指导教师: 职 称: 正高工 教 授 黑 龙 江 工 程 学 院 二○一四年六月 The Graduation Design for Bachelors Degree Design of the Shuangyin Hill Highway Tunnel Candidate:Qi Xiu Specialty:Civil Engineering(Geotechnical) Supervisors:Pro-Senior Engineer Xia Yankun Prof. Ma Guijun Heilongjiang Institute of Technology 2014-06·Harbin 摘  要 本设计为双阴山公路隧道设计,该隧道位于伊春—鹤岗公路第三标段,为直线型分离式单向行驶两车道长隧道,上行线桩号为K20+163~K21+587,全长1424m;下行线桩号为K20+155~K21+600,全长1445m。所处围岩级别为III、IV级。隧道采用双向坡,坡度均为1%。隧道衬砌采用复合式衬砌,断面形式为曲墙拱形断面,洞门为翼墙式洞门,明洞与暗洞形式相同,明洞采用明挖法施工,暗洞采用新奥法施工。 本次设计主要内容为隧道总体设计、明洞设计、衬砌设计、通风照明设计、防排水设计、施工方案设计。通过总体设计确定了隧道平面、纵断面、横断面线形及人、车行横通道位置;通过洞门设计确定了洞门的位置及形式;通过明洞和衬砌设计确定了明洞长度、明洞及衬砌结构形式;最后确定了通风照明防排水及施工方案并绘制了27张图纸。 通过以上设计,经验算后,确定本次设计合理,方案可行。 关键词:隧道;衬砌;明洞;洞门;明挖法;新奥法 ABSTRACT This is the highway tunnel design of Shuangyin hill . The tunnel is located at the 3th section of the highway of Yichun to Hegang . It is a linear separated one-way tunnel with two lanes on eachside . The uplink is K20+163~K21+587 , and its total length is 1424m . The downlink mileage is K20+155~K21+600 , and its total length is 1445m .The strength of the surrounding rock of the tunnel belongs to III and IV level. This tunnel is designed as double slope, and the slope is 1% . The combined type is used linking . The cross section form of the tunnel is curved wall’s aches, and the tunnel portal is designed as the wing wall. Meanwhile, the open cut hole and the dark hole have the same form . The open excavation method is used to construct the open cut hole, and the dark hole was constructed by NATM . The main content of this design includes the overall tunnel design, the open cut hole design , the lining design , ventilation and lighting design , waterproof and drainage design, construction scheme design . According to the overall tunnel design determined the tunnel plane , vertical section and cross section

文档评论(0)

绿风 + 关注
实名认证
内容提供者

教师资格证持证人

该用户很懒,什么也没介绍

领域认证该用户于2024年11月27日上传了教师资格证

1亿VIP精品文档

相关文档