网站大量收购闲置独家精品文档,联系QQ:2885784924

重庆市一栋九层的假日酒店空调、通风及防排烟设计 毕业设计.doc

重庆市一栋九层的假日酒店空调、通风及防排烟设计 毕业设计.doc

  1. 1、本文档共74页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
摘 要 本设计为重庆市一栋九层的假日酒店空调、通风及防排烟设计。该建筑总的建筑面积为m2,建筑高度为33.2m,属于多层建筑。地上共九层,其中首层为大堂,办公室和厨房,二层为办公空间及客房;三至九层为标准客房及套房。 根据本建筑的功能特点,选取了风机盘管+独立新风系统空调方式。风机盘管+独立新风的空调方式是 Abstract This air-condition is designed for a hotel in chongqing city .There are 9 floors in this building. Underground 2 to 1 are the garages ,and underground 3 is machine room and saveing water for living and the fire. Ground 1 to 3 are the markets and the hall for the vistors who come to the hotel or offices, The rooms of F4 to F9 is for working , The10~14 F is a guest room. According to this construction characteristic and to save the place for people , the entire air system is mainly use air fan-coil system + independent new atmosphere system . primary air fan-coil system + independent new atmosphere system is undertakes in the room by the air blower serpentined all cold loads and new atmosphere Part of Wet loads, but the new atmosphere load undertakes by each new atmosphere unit, the new atmosphere processes through the new atmosphere unit to With the room ,and the fresh air is sent into the room directly. Whole heat exchangers + independent new atmosphere system is undertakes in the room by the air blower serpentined all cold loads and new atmosphere Part of Wet loads.In the market,we use large air fan-coil system and independent new atmosphere system.To get blancer air distribution ,we use meditional powers. To make the garages under ground air ventilate the dirty air put off by cars ,we use the fan named youdao.This systerm can improve the efficience of the ventilate system. This design introduced the determination of the system plan in detail, the calculation of cooling and heating load for air conditioning and fresh air, the examination of air distribution, the shaping of equipments ,the Water friction calculation of Water system, the design of the chilling machine room and the arrangement of the system,and the design of the smoke prevention. At the end of the Whole design, silencing device and sh

文档评论(0)

绿风 + 关注
实名认证
内容提供者

教师资格证持证人

该用户很懒,什么也没介绍

领域认证该用户于2024年11月27日上传了教师资格证

1亿VIP精品文档

相关文档