- 1、本文档共99页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Rotating System Function: It makes the drill bit turn Rotating Assembly: Surface rotating system(top drive), downhole rotating system (drill stem) Rotating Equipment Master bushing Rotary table Drill floor Bearing Tools——wellhead tools Slips[slip] 卡瓦 Safety slip 安全卡瓦 Elevator 吊卡 Backup tong (box end) Makeup tong( pin end) Hydraulic tong Lifting sub/elevator plug/lifting nipple提升短节 spinner—pneumatic tool * 3 .Rotating system –drilling column (drill string) kelly 八、Monitoring system 八、Monitoring system * 6. Well Monitoring system Safety requires constant monitoring of the drilling process. If drilling problems are detected early remedial action can be taken quickly, thereby avoiding major problems. The driller must be aware of how drilling parameters are changing (e.g. WOB, RPM, pump rate, pump pressure, gas content of mud etc.). For this reason there are various gauges installed on the driller’s console where he can read them easily. Mudlogging house Parameters monitoring * Depth Penetration rate Hook load Rotary speed Rotary torque Pump rate Pump pressure Mud density Mud temperature Mud Salinity Gas content Hazardous gas content of air Pit level Mud flow rate 6. Well Monitoring system 不妥之处敬请指正 谢谢大家! * * There are many individual pieces of equipment on a rotary drilling rig. These individual pieces of equipment can however be grouped together into six sub systems. These systems are: the power system; the hoisting system; the circulating system; the rotary system; the well control system and the well monitoring system. Although the pieces of equipment associated with these systems will vary in design, these systems will be found on all drilling rigs. * * * * * * * * The function of the well control system is to prevent the uncontrolled flow of formation fluids from the wellbore. When the drill bit enters a permeable formation the pressure in the pore space of the formation may be greater than the hydrostatic pressure exerted by the mud column. If
您可能关注的文档
- CH1网络工程绪论解说.ppt
- ch1直流电机的结构与工作原理解说.ppt
- ch02_权衡取舍、比较优势和市场体系解说.ppt
- Ch02Words解说.ppt
- ch02-复件解说.ppt
- Ch02国际市场营销环境解说.ppt
- Ch02-可行性研究解说.ppt
- Ch02资产负债表要素解说.ppt
- ch2:基本核算方法解说.ppt
- ch2__需求、供给新解说.ppt
- 金融产品2024年投资策略报告:积极适应市场风格,行为金融+机器学习新发现.pdf
- 交运物流2024年度投资策略:转型十字路,峰回路又转(2023120317).pdf
- 建材行业2024年投资策略报告:板块持续磨底,重点关注需求侧复苏.pdf
- 宏观2024年投资策略报告:复苏之路.pdf
- 光储氢2024年投资策略报告:复苏在春季,需求的非线性增长曙光初现.pdf
- 公用环保2024年投资策略报告:电改持续推进,火电盈利稳定性有望进一步提升.pdf
- 房地产2024年投资策略报告:聚焦三大工程,静待需求修复.pdf
- 保险2024年投资策略报告:资产负债匹配穿越利率周期.pdf
- 政策研究2024年宏观政策与经济形势展望:共识与分歧.pdf
- 有色金属行业2024年投资策略报告:新旧需求共振&工业原料受限,构筑有色大海星辰.pdf
文档评论(0)