- 1、本文档共21页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Page * Supplier Training GP-5 December, 2001 Edition Purpose: Train Supplier personnel on changes to GP-5/GQTS Process: Explanation of GP-5 enhancements and screen shots of GQTS enhancements Product: Understanding of process and system enhancements Overview of changes made to the procedure Overview of PRR System Changes in GQTS Description of GM SupplyPower GP-5 folder What does this GP-5 Training Include? Changes to GP-5 Control and Rework Company A company approved by General Motors to perform controlled shipping level 2 inspections or other work necessary to ensure product quality. This company performs directly under the responsibility of the supplier. Line Accumulations Line accumulations are defined as unavoidable discrepancies or single cases of commodities where only initial response is needed. These PRRs will be issued on a monthly basis per part or part group. Definitions added to GP-5 Quality Performance Reports Monthly 6 panel charts that graphically display the data contained in GQTS. Charts display the following: Major Disruptions (Spills, Downtime, Stockouts) PRRs Discrepant Parts PPM Sourcing Metrics Supplier evaluation system that ranks each supplier manufacturing location in terms of overall quality in one of three categories: green, yellow or red. The ranking criteria are based on the historical commodity performance. (Example – Enhanced Metric Bid List) Changes to GP-5 Definitions added to GP-5 Changes to GP-5 Packaging PRRs (section 4.2.2) Packaging PRR s are now defined as packaging issues that cause part/specification nonconformity, or effect salability of the part. Examples: Damaged part or material that was inadequately secured in the container Container was inadequately secured in the carrier vehicle and caused part/material damage Container design and/or fabrication was inadequate and caused part/material damage Container that has been damaged by improper handling and caused
您可能关注的文档
最近下载
- 兰生复旦2018学年第一学期六年级期中考试数学试卷.pdf VIP
- 新版糖尿病饮食管理手掌法则.pptx VIP
- 急诊介入护理案例分析ppt.pptx
- 2024年秋季学期德育主题教育活动安排表.docx VIP
- 2020-2021学年上海市杨浦区民办兰生复旦中学六年级(下)期中数学试卷(五四学制).docx VIP
- 医院推广健康促进工作亮点情况汇报.doc VIP
- 2024必威体育精装版民事起诉状.doc VIP
- 天然气管道项目行政审批工作流程汇编大全.doc
- 美的品牌浅析课件.pptx VIP
- 2023-2024学年上海市杨浦区上海民办兰生中学六年级上学期期中(五四制)数学试卷含详解.docx VIP
文档评论(0)