- 1、本文档共21页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
WhatHappenstoaCulturalReportOnceitisSenttoBFO.ppt
WHAT HAPPENS TO A CULTURAL REPORT ONCE IT IS SENT TO BFO? BFO ADMIN STAFF RECEIVES THE REPORT Date stamped Given a BFO specific number and logged into the BFO database Report is placed in the “To Be Reviewed” files COMPONENTS REVIEW One cultural staff person is assigned to do component reviews each month. PODs are not accepted unless they contain all the important components, including a cultural report. The component review sheet is signed off if BFO has two copies of the report The report is not reviewed, the files are simply checked to see if we physically have the report POD TEAM ASSIGNMENT Once a POD is “on the shelf” and ready to work, teams are assigned Cultural staff are assigned by the assistant field manager somewhat randomly based on their experience with nearby PODs, possible unique issues and workload concerns POD teams include an NRS, wildlife biologist, legal assistant, legal instruments examiner, geologist, petroleum engineer, hydrologist, realty specialist, civil engineer and cultural specialist INITIAL REVIEW Upon POD assignment, the cultural specialist performs a cursory review of the report with the following in mind: Does the inventory cover the entire POD Does the report contain all the necessary forms Are there any outstanding issues that may delay POD approval (Native American consultation, settings issues, Bozeman Trail, etc.) INITIAL TEAM MEETING Within one week of POD assignment, an initial team meeting is held to: Schedule the Operator Initial meeting (OIM) and onsite dates Determine if there are any issues with the cultural report that need to be resolved before the OIM or onsite Ensure the infrastructure on the POD map matches that portrayed in the cultural report OPERATOR INITIAL MEETING POD team, landowners, the operators representative and various operators’ consultants attend the meeting Occasionally contract archeologists are asked to attend The operator receives deficiencies for the entire POD, including any deficiencies with
您可能关注的文档
- SampleReport.doc
- SBT××××—20031SBT10023—20××目次前言1范围2规范性.doc
- schoolbusreports-Maine.gov.ppt
- Scientificoreducationalpurposespermitreport-Departmentof.doc
- ScientificReportWriting.ppt
- Scientificwriting.ppt
- SCM8.2.ppt.ppt
- SectionB.FailuretoReportforReviewExamination(U.S.Department.doc
- SEN958-SampleSyllabus-ITU.edu.doc
- SEO关键词检查过程-TigerInternetMarketing.ppt
文档评论(0)