- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
律师事务所法律实习周记
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 律师个人简历2013必威体育精装版.doc
- 律师个人简历之范文.doc
- 律师个人简历模板下载.doc
- 律师个人简历范文推荐.doc
- 律师个人简历范文赏析.doc
- 律师个人简历表格.doc
- 律师个人简历表格范文.doc
- 律师个人简历:律师个人简历范文.doc
- 律师个人简历:律师求职简.doc
- 律师中文个人简历模板.doc
- 《GB/Z 44363-2024致热性 医疗器械热原试验的原理和方法》.pdf
- GB/T 16716.6-2024包装与环境 第6部分:有机循环.pdf
- 中国国家标准 GB/T 44376.1-2024微细气泡技术 水处理应用 第1 部分:亚甲基蓝脱色法评价臭氧微细气泡水发生系统.pdf
- 《GB/T 44376.1-2024微细气泡技术 水处理应用 第1 部分:亚甲基蓝脱色法评价臭氧微细气泡水发生系统》.pdf
- GB/T 44376.1-2024微细气泡技术 水处理应用 第1 部分:亚甲基蓝脱色法评价臭氧微细气泡水发生系统.pdf
- 中国国家标准 GB/T 44315-2024科技馆展品设计通用要求.pdf
- GB/T 44305.2-2024塑料 增塑聚氯乙烯(PVC-P)模塑和挤塑材料 第2部分:试样制备和性能测定.pdf
- 《GB/T 44315-2024科技馆展品设计通用要求》.pdf
- GB/T 44315-2024科技馆展品设计通用要求.pdf
- GB/T 39560.9-2024电子电气产品中某些物质的测定 第9 部分:气相色谱-质谱法(GC-MS)测定聚合物中的六溴环十二烷.pdf
文档评论(0)