- 1、本文档共43页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SWGamp;DMSPSsimulations.ppt
SWG
DMS/PS simulations;SWG Kick-Off meeting – Cambridge 11-12 March 2002 ;Community involvement: task list;April 19 2002;Organisation of the work;Proposed structure of GAIA simulator;Proposed organisation of development;Working tools;Common tool box data generators;Integration of contributions;Status;The GAIA System Simulator (GASS)
The aim of the GASS is to simulate GAIA telemetry (observation + satellite HK data) using models of the objects and instruments.;GASS - Simulation Process
Simulation of the objects visible along the scan of the instruments. For each object and epoch the program simulates position, kinematics and photometry. This step includes an Universe model and the scanning law and orbitals parameters of the satellite.
Transformation from sky coordinates to instrument coordinates. This step includes the geometry and the optics of the instrument, together with the configuration of the field of view (FOV).
Simulation of the observational process according to the instrumental parameters: detection, acquisition of data and telemetry. This step includes a model of the observational process.;Reference;GASS - Current status;Gaia Image and Basic Instrument Simulator;GIBIS Simulator;GIBIS Status;Priorities schedule;2001;Long term mission schedule;SWG priorities – immediate (2-3 months);SWG priorities – short term (2002-2005) I;SWG priorities – short term (2002-2005) II;SWG priorities – long term (2005 ?) I;Scientific exploitation
Produce simulated data allowing teams to prepare the exploitation of GAIA data (through GAIA DB?).;SWG initial schedule milestones;DMS/PS simulations;;Object simulation: SnapShots;Crude simulation of Double Star / Planets;I) Generation;II) Observations;Optimisations Needed;April 19 2002;Backup slides;Instrument models;UML;The Unified Modelling Language (UML) was developed as a tool for the design and management of software projects:;Java;We propose to build the system around a Java core.
It is possible, with proper pla
文档评论(0)