网站大量收购闲置独家精品文档,联系QQ:2885784924

建筑电气施工设计论文.doc

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑电气施工设计论文

Electric Works 一、 Technological process Diagram 二、 Open–pipe installation The position and elevation are correct, and the grounding is good Draw integrated drawing and detail of pipeline grounding Installation on crane span structure slot Correct level, installation on hanger frame, fire protection treatment of through-wall and floor, clearance with other special pipeline Draw integrated drawing, installation drawing of hanger frame, and detail of fire protection treatment Threading distribution Wiring correct error, conducting wire with rinsing tin, conducting wire with damage Strictly carry out wiring drawing, rinsing tin, pay attention to protecting the wire when threading Cable lay Straight cable, firm fixing, cable bending, and identification Implement requirements relating to drawing and specification Soldered dot Ground resistance at welded position, and the surface at welded point is smooth and full Test the ground resistance of welded position after finishing the welding. Appliance installation The position is correct and installed firmly, the appearance is good. Arrange the plan installation according to electromechanical drawn integration diagram and surface appliance Debugging Operating stability, reliability, and insulating shake-measure in system Work out the special debugging plan 三、1、pipes in the project adopt the open-lay technology of galvanized steel pipe. (1)(2)(3)Pipes that the pipe diameter is less than 20mm may adopt a palm simmer pipe machine. Pipes that the pipe diameter is more than 25mm may use a hydraulic simmer pipe machine (or special simmer pipe machine). The concavity at simmering bends should accord with specifications and regulations. (4)The size of pipe needing to cut should be exact. Put pipes on the center of pressure jaw, and keep fractures even. At fracture, fill the inner or outer of pipe orifice smoothly without any burr. The scrap iron in pipe should be cleaned clearly. (5)Select correspo

文档评论(0)

didala + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档