accurate and reliable connection.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
accurate and reliable connection

accurate and reliable connection. 18, the whole heating system after the installation, should be unified to wash and trial run, then we should clean the dirt separator, examined to assess acceptance (within the system without sundry, airless water run, run, drip, leak) qualified after visa, just can put into operation. 【 7 】 water system installation 1, the water in the pipe hydraulic test should meet the design requirements. When required by the design without, shall meet the following requirements: water pipe system test pressure is 1.5 times of working pressure, but shall not be less than 0.6 MPa. 2, water pipes in washing and water test should be done before delivery. 3, water in the cistern and cistern of life set up in a different room, conditions do not allow only design in a room, and the life of the cistern net distance should be greater than 2 m. 4, greening, labor, car washing, appropriate USES wall hydrant or underground. 5, water in the water supply pipe with no drinking water supply pipe connection, the water in the water supply pipe shall not be installed for water mouth. 6, the outer wall of water in the pipe should be painted light green. 7, the tank (tank), valves, water meter and hydrant shall have water logo. 8, water pipe should not be equipped with hidden in the wall and floor, such as the slot should be equipped with hidden in the wall, should be obvious and will not fall off in the line. 9, water equipment installation debugging should comply with the regulations of the national standard and professional manufacturers of technical requirements. In section 11 Building electrical engineering 【 1 】 general provisions 1, electrical engineering dismantled before, should prepare the demolishing scheme, and the relevant departments and supervision engineer for approval. 2, electrical engineering, demolition completed, should be confirmed by the relevant departments and supervision engineer, can repair part of the construction. 3, e

文档评论(0)

sd44055 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档