aifeiya锅炉换管工艺.docVIP

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
aifeiya锅炉换管工艺

PROCEDURE OF BOILER TUBE REWELDING 1.BRIEF: 1.1 The boiler is fuel oil boiler, some welding seam between boil tubes and tube plate found cracks and leakage. as owner’s requirement, all the welding seam between tubes boil tubes and tube plate to be rewelded. This repair is only a temporary repair because this tube plate has been badly deformed and need renewal. Shipyard will take no responsibility if any accident happened after this repair. We suggest that the ship owner should renewal the tube plate and boil tubes as soon as possible. 1.2 Tubes and tube plate to be fitted with the way of welding. 2.BOILER DATA: 2.1 Working pressure: to be supplied by owner. 3.REWELDING PROCEDURE: 3.1 Preparation on spot: 3.1.1 Manhole covers of boiler water and gas side to be opened. 4.1.2 Staging to be erected, safety precaution should be ensured, and the spot should be clean. 3.2 Welding seam gouging: 4.2.1 Mark and record all the stay tube position. 4.2.2 Cut the welding seam between tube and tube plate by gouging. Be careful no to damage the tube and tube plate. The cutting area to be ground smoothly. 3.3 Inspection tube plates: 3.3.1 After grinding and cleaning, the surface of tube plate to be dye penetrate tested and approved by superintendent. Rewelding: Around the tube holes should be cleaned and smooth and to be approved. Stay tubes to be welded first, then the other tubes. 3.5 Welding: 3.5.1 The J507(E5015)low hydrogen alkaline welding rod to be used, DIA.2.5-3.2mm, AC reverse welding. Rods to be baked and kept warm for 1.5 hours before welding. Rods’ quality certificate approved by classification to be supplied. . 3.5.2 Weld the tubes according to the attached drawing, then clean the welding area. 3.5.3 Welding quality request:welding seam surface should be full and in good shape, and have no disfigurement. 3.5.4 The welders should have welding certificate approved by classification. 3.6 Welding seam inspection: All the welding seam to be 25% MPI tested, an

文档评论(0)

sb9185sb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档