- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
信息系统项目管理师-历年英文题
2005年上项目管理师
● (66) is a method of constructing a project schedule network diagram that uses boxes
or rectangles, referred to as nodes, to represent activities and connects them with arrows that
show the dependencies.
This method includes following types of dependencies or precedence relationships:
(67, the initiation of the successor activity, depends upon the completion of the
predecessor activity.
(68, the initiation of the successor activity, depends upon the initiation of the
predecessor activity.
(66)A. PDM B. CPM C. PERT D. AOA
(67)A. F-S B. F-F C. S-F D. S-S
(68)A. F-S B. F-F C. S-F D. S-S
● Estimating schedule activity costs involves developing an (69) of the costs of the
resources needed to complete each schedule activity. Cost estimating includes identifying and
considering various costing alternatives. For example, in most application areas, additional work
during a design phase is widely held to have the potential for reducing the cost of the execution
phase and product operations. The cost estimating process considers whether the expected
savings can offset the cost of the additional design work. Cost estimates are generally expressed
in units of (70) to facilitate comparisons both within and across projects. The (71)
describes the business need, justification, requirements, and current boundaries for the project. It
provides important information about project requirements that is considered during cost
estimating.
(69)A. accuracy B. approximation C. specification D. summary
(70)A. activity B. work C. currency D. time
(71)A. project scope statement B. statement of work C. project management plan D. project policy
● The (72) technique involves using project characteristics in a mathematical model
to predict total project costs. Models can be simple or complex.
(72)A. Cost Aggregation B. Reserve Analysis
C. Parametric Estimating D. Funding Limit Reconciliation
● (73) is a measurable, verifiable work product such as a specification, feas