- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
NGN现场勘测ENed03
Spatial Site Survey Questionnaire
CUSTOMER NAME: Myanmar Ministry of Post Telecommunications MPT Global Telephone
CUSTOMER SITE: Yangon – existing S12 MSC site. Also includes 8650 SDM, 7500 SGSN, 5 BSCs, 3 TCs, 1 MFS, CG, old SGSN, old HLR
Shwe Gon Dine MPT building
1st Floor : Battery + Power Supply
2nd Floor: Equipment Room
. CONTENTS
1 Environmental Considerations 3
1.1 Floor …………………………………………………………………………………….3
1.2 Ceiling 3
1.3 General Location Data 4
2 Site Survey Data Summary 5
Environmental Considerations
Floor
On what floor s will the equipment located? For example, 1st, 2nd 2nd Is there a raised floor false floor ?
If Yes, state how many inches high Yes No
Tile Size: Width Length Thickness Net height of floor? distance between ground and floor
Take measurements from several points to account for variation in floor. What type of floor covering is laid? Carpet Carpet Tiles
Concrete Other please specify Is there enough space to move rack into switching room Yes No
to be measured space of stairs and doors. Raised floor cable rack tile cutouts have been provided for power and signal / data cables. Yes No ?Power cable racks provided
Ceiling
What is ceiling height?
Height 5 m Is there 10 feet minimum 3 meter clearance in the area where the switch node is to be located? Yes No Is there a false ceiling suspended Yes No
General Location Data
This project is Initial Expansion.
Node Type is WSS WMG SGSN Other
This office is a Host Remote
If Remote office, what is Host Notes:
An audit of the power supply should be done. There is strong possibility that we will need to change the rectifiers.
For initial deployment; my suggestion is to install first: WCS, 1xWMG, XMC; potentially 3-4 racks.
in the old GGSN rack, there are some Ethernet switches and other networking gear that must remain, but we can remove the old GGSN and use that space for our IT equipment.
Customer suggest:
For initial placement of WCS, WMG and