- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公务员压力疏导情绪管理(100分)
enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to effectively carry out the insulation waterproof measures fail to install protective panels in part with three tarpaulin cover, to prevent insulation from moisture. Insulation seam Michael Jackson 5mm, joints, joints 100mm, insulation thickness tolerance +10MM~ – 5mm , appropriate material elastic banding, spacing according to the design requirements, rigid insulation soft materials for construction joints tight; And large-diameter vertical pipe for high temperature pipeline in strict accordance with design drawings called for the establishment of expansion joints and holding bracket; Design requirements into a removable type of insulation, in strict accordance with specifications disconnect from the other insulation; Surface insulation boards in the technology of plastering construction of woven cloth to prevent pollution and protective panels flush with the surface interface, tight and clean. Site measurement of insulation boards for elbow shape cutting, ensure that each piece of lapped traffic, arc transition of natural, beautiful, screws up. Stampede outside construction personnel is strictly prohibited and shelve objects directly on the outer shield. In order to prevent the pollution-prone heater, channel area of secondary pollution of large-diameter pipes and other equipment, weaving cloth, and erection of the separation platform for preservation. Thermal insulation construction, on-hook tack welded to the consolidated line, to ensure evenly spaced, and the hook nailed down ... See next page flow chart management process. 7.2 General requirements for protective product protection
enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspe
您可能关注的文档
最近下载
- 国家开放大学电大专科《植物学基础》期末试题、选择填空简答题题库、单项选择题题库、判断正误题题库及答案10套(试卷号:2704).pdf
- 汉语语法 - 石毓智.pdf
- 河西新区棚改(城中村)安置小区项目可行性研究报告.pdf
- 《中国民间美术剪纸》课程教学大纲.doc
- 30题汽车标定工程师岗位常见面试问题含HR问题考察点及参考回答.docx VIP
- 四年级的乘除法混合脱式计算练习题及答案(四年级数学计算题100道).pdf
- 除法脱式计算简算四年级练习题及答案(四年级数学计算题100道).pdf
- 政治学:谁得到什么?何时和如何得到?.doc
- 100道脱式计算含竖式答案 四年级脱式计算题100道 简算 简算,更要简单.docx
- 佳能R62使用说明书【必威体育精装版完整电子版】.pdf
文档评论(0)