- 1、本文档共23页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公务员考试行政业能力倾向模拟试题(五)(含答案)
公务员考试行政职业能力倾向模拟试题 五 (含答案)
第一部分 数量关系
一、数字推理
下面的每一道试题北京国家公务员公务员驱动汽车河北法院政策
enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to effectively carry out the insulation waterproof measures fail to install protective panels in part with three tarpaulin cover, to prevent insulation from moisture. Insulation seam Michael Jackson 5mm, joints, joints 100mm, insulation thickness tolerance +10MM~ – 5mm , appropriate material elastic banding, spacing according to the design requirements, rigid insulation soft materials for construction joints tight; And large-diameter vertical pipe for high temperature pipeline in strict accordance with design drawings called for the establishment of expansion joints and holding bracket; Design requirements into a removable type of insulation, in strict accordance with specifications disconnect from the other insulation; Surface insulation boards in the technology of plastering construction of woven cloth to prevent pollution and protective panels flush with the surface interface, tight and clean. Site measurement of insulation boards for elbow shape cutting, ensure that each piece of lapped traffic, arc transition of natural, beautiful, screws up. Stampede outside construction personnel is strictly prohibited and shelve objects directly on the outer shield. In order to prevent the pollution-prone heater, channel area of secondary pollution of large-diameter pipes and other equipment, weaving cloth, and erection of the separation platform for preservation. Thermal insulation construction, on-hook tack welded to the consolidated line, to ensure evenly spaced, and the hook nailed down ... See next page flow chart management process. 7.2 General requirements for protective product protection
enforced thermal insulation starts checking system, issued by the the
您可能关注的文档
最近下载
- 北京-EU5-产品使用说明书-EU5-BJ7000C5D3-BEV-北汽新能源EU5车型用户手册V3.pdf
- 特定场景自动驾驶,快速上行赛道值得关注_2022-05-自动驾驶.pdf
- 液氯(氯气)和氯乙烯生产企业以及过氧化企业安全风险隐患排查指南.docx VIP
- 《城市规划设计计费指导意见》2017修订版.docx
- 液氯(氯气)生产企业重点检查项安全风险隐患排查表.docx VIP
- 《作文》专题系列课件126《作文分论之_诗歌类材料作文》.ppt
- 2023年度公务员考试(公考)行政职业能力测验(行测)测试卷(附答案和解析).pdf VIP
- LittleSwan小天鹅TB36V81H 波轮全自动洗衣机 巴赫银 门盖巴赫银 波轮式 220V,1Ph 50Hz.pdf
- 广东梅州抽水蓄能电站二期环境影响报告书(送审稿).doc
- 第一讲:形势与政策课件.ppt VIP
文档评论(0)