- 1、本文档共49页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公路实施性施工织设计
公路实施性施工组织设计
enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to effectively carry out the insulation waterproof measures fail to install protective panels in part with three tarpaulin cover, to prevent insulation from moisture. Insulation seam Michael Jackson 5mm, joints, joints 100mm, insulation thickness tolerance +10MM~ – 5mm , appropriate material elastic banding, spacing according to the design requirements, rigid insulation soft materials for construction joints tight; And large-diameter vertical pipe for high temperature pipeline in strict accordance with design drawings called for the establishment of expansion joints and holding bracket; Design requirements into a removable type of insulation, in strict accordance with specifications disconnect from the other insulation; Surface insulation boards in the technology of plastering construction of woven cloth to prevent pollution and protective panels flush with the surface interface, tight and clean. Site measurement of insulation boards for elbow shape cutting, ensure that each piece of lapped traffic, arc transition of natural, beautiful, screws up. Stampede outside construction personnel is strictly prohibited and shelve objects directly on the outer shield. In order to prevent the pollution-prone heater, channel area of secondary pollution of large-diameter pipes and other equipment, weaving cloth, and erection of the separation platform for preservation. Thermal insulation construction, on-hook tack welded to the consolidated line, to ensure evenly spaced, and the hook nailed down ... See next page flow chart management process. 7.2 General requirements for protective product protection
enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, tra
您可能关注的文档
- 八马茶业股份有公司.doc
- 八种深海怪异发生物.doc
- 八解求客观规律真2.doc
- 公主岭市旅游景行业研究报告.doc
- 公众公司公众公的独立审计:多重博弈的社会化契约的应用.doc
- 公共关系学作业1205.doc
- 公共卫生执业医历年真题--卫生统计.doc
- 公共卫生执业医考试中级职称考试卫生统计学.doc
- 公共卫生助理执医师卫生标准辅导资料汇总.doc
- 公共建筑装饰工【评分表.doc
- 汽车4S店员工内训课件07奥迪4S店新员工培训.pdf
- 辽宁省第二届职业技能大赛(轨道车辆技术赛项)理论参考试题库(含答案).pdf
- 2024年第四届全国工业设计职业技能大赛决赛(包装设计师)理论考试题库(含答案).pdf
- 精品解析:2022年广西壮族自治区学业水平考试押题预测卷 (一)历史试题(原卷版).docx
- 2024版《立体构成》全套课件完整版.ppt
- 《机上应急医疗》习题及答案.docx
- 2024年儿童保健技能大赛理论考试题库500题(含答案).pdf
- 计算机整机装配调试员技能竞赛备考试题库(含答案).pdf
- 《机床电气控制与PLC》期末试卷-A卷及答案.doc
- C++程序设计教程课件-C++多态与虚函数课件.pdf
文档评论(0)