名校四级密卷华师范大学卷(阅读部分).doc

名校四级密卷华师范大学卷(阅读部分).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
名校四级密卷华师范大学卷(阅读部分)

中国名校四级密卷华东师范大学卷 发布日期:[2003-12-23 9:27:59] enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to effectively carry out the insulation waterproof measures fail to install protective panels in part with three tarpaulin cover, to prevent insulation from moisture. Insulation seam Michael Jackson 5mm, joints, joints 100mm, insulation thickness tolerance (+10MM~ – 5mm), appropriate material elastic banding, spacing according to the design requirements, rigid insulation soft materials for construction joints tight; And large-diameter vertical pipe for high temperature pipeline in strict accordance with design drawings called for the establishment of expansion joints and holding bracket; Design requirements into a removable type of insulation, in strict accordance with specifications disconnect from the other insulation; Surface insulation boards in the technology of plastering construction of woven cloth to prevent pollution and protective panels flush with the surface interface, tight and clean. Site measurement of insulation boards for elbow shape cutting, ensure that each piece of lapped traffic, arc transition of natural, beautiful, screws up. Stampede outside construction personnel is strictly prohibited and shelve objects directly on the outer shield. In order to prevent the pollution-prone heater, channel area of secondary pollution of large-diameter pipes and other equipment, weaving cloth, and erection of the separation platform for preservation. Thermal insulation construction, on-hook tack welded to the consolidated line, to ensure evenly spaced, and the hook nailed down ... See next page flow chart management process. 7.2 General requirements for protective product protection enforced thermal insulation starts checking system, issued by the thermal insulation const

您可能关注的文档

文档评论(0)

rvd137 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档