- 1、本文档共71页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《促织经》-贾道-影
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programm
您可能关注的文档
- VM安装Linx的全程图解教程.doc
- vsFTPd 务器初学者指南.docx
- WEB 服务器件配置方案.doc
- WAW系列电液服万能机使用说明书.doc
- Web开发框架权限管理系统.doc
- well在在老记中的使用及其翻译.doc
- win7取得管员权限.doc
- win7快速打命令行窗口的小技巧.doc
- win7获得管员权限设置图文教程.doc
- Win7夺取管员权限.doc
- 第十一章 电流和电路专题特训二 实物图与电路图的互画 教学设计 2024-2025学年鲁科版物理九年级上册.docx
- 人教版七年级上册信息技术6.3加工音频素材 教学设计.docx
- 5.1自然地理环境的整体性 说课教案 (1).docx
- 4.1 夯实法治基础 教学设计-2023-2024学年统编版九年级道德与法治上册.docx
- 3.1 光的色彩 颜色 电子教案 2023-2024学年苏科版为了八年级上学期.docx
- 小学体育与健康 四年级下册健康教育 教案.docx
- 2024-2025学年初中数学九年级下册北京课改版(2024)教学设计合集.docx
- 2024-2025学年初中科学七年级下册浙教版(2024)教学设计合集.docx
- 2024-2025学年小学信息技术(信息科技)六年级下册浙摄影版(2013)教学设计合集.docx
- 2024-2025学年小学美术二年级下册人美版(常锐伦、欧京海)教学设计合集.docx
文档评论(0)