- 1、本文档共40页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
普华的customerfocusedinventorymanagement(PPT40页)
Customer Focused Inventory Management (CFIM) Programs Table of Contents Semiconductor Industry Characteristics and High Tech Industry Dynamics Questions surrounding CFIM – What, How, When and with Whom Impact on Operating Model Maximizing Benefits from a CFIM program Case Studies - Summary Key Learnings Recommendations Back Up Table of Contents Semiconductor Industry Characteristics and High Tech Industry Dynamics Questions surrounding CFIM – What, How, When and with Whom Impact on Operating Model Maximizing Benefits from a CFIM program Case Studies - Summary Key Learnings Recommendations Back Up Semiconductor Industry Characteristics The semiconductor industry is inherently challenging, defined by: A complex, multi-node value web that includes multiple entities and trading partners, driving the need for extraordinary communication between vendors and customers to manage the demand signal A significant mismatch between manufacturing lead time (~ 48 days) and order fulfillment cycle times (~ 15 days) that drives forecast-based production The uncertainty of such forecasts invariably leads to excess inventory An environment in which a majority of the inventory resides post fab In wafer banks pre and post test, and in die banks pre and post package, and in some cases as finished goods As a result, small changes in demand will cause large perturbations in supply resulting in significant inventory management challenges Impact to Strategic Operating Model: Push to Pull 买卖双方力量制衡对存货管理的影响 存货管理策略的演变 How Bad is the Problem? In Q42000, when excess inventory reached a peak, most of the excess inventory was with semiconductor suppliers and EMS providers. The OEMs and EMS providers have been trying to offload more inventory to the suppliers. Table of Contents Semiconductor Industry Characteristics and High Tech Industry Dynamics Questions surrounding CFIM – What, How, When and with Whom Impact on Operating Model Maximizing Benefits from a CFIM program Case Studies -
您可能关注的文档
- 总经理工作职务规格表.DOC
- 总经理目标设定表.doc
- 总经理秘书工作说明书.doc
- 总经理岗位软指标评分表.doc
- 总结_我国水污染治理行业2007年发展报告.doc
- 总装厂装配钳工岗位说明书.doc
- 总装产品工程师岗位说明书.doc
- 总装检验班班长工作说明书.doc
- 总装工厂异常工时分析报告.doc
- 总装车间主任工作说明书.doc
- 基本面选股组合月报:大模型AI选股组合本年超额收益达6.60.pdf
- 可转债打新系列:安集转债,高端半导体材料供应商.pdf
- 可转债打新系列:伟测转债,国内头部第三方IC测试企业.pdf
- 联想集团PC换机周期下的价值重估.pdf
- 计算机行业跟踪:关税升级,国产突围.pdf
- 科技类指数基金专题研究报告:详解AI产业链指数及基金布局.pdf
- 计算机行业研究:AIAgent产品持续发布,关税对板块业绩影响较小.pdf
- 民士达深度报告:国内芳纶纸龙头,把握变局期崛起机遇.pdf
- 社会服务行业动态:全球首张民用无人驾驶载人航空器运营合格证落地,霸王茶姬冲击美股IPO.pdf
- 通信行业研究:特朗普关税令落地,长期看好国产算力链.pdf
文档评论(0)