- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Dynamic maagement with schedule and labor contract as the basis of the principle
Dynamic management with schedule and labor contract as the basis of the principle.
2. The rigger engaged in hoisting machinery operations, scaffolder engaging in the operations in which high erection, are prone to personnel casualty accidents, to the operator himself, others and the surrounding facilities safety significant danger.
3. The rigger and scaffolder belong to special operations personnel, according to the relevant provisions of the special operations personnel must hold relevant certificates.
4. General accident means killed 3 people below, the following serious injury accident or 10 people.
5. The main content of the hoisting plan should also include schedule; Resource planning (including human, machine, material, etc.); Safety technical measures; Risk assessment and contingency plans, etc.
1 P338
Case 1 h420070-2 】 【
Third, analysis and reference answer
1. The lifting device or component of the main causes of instability: design with a lifting force, small stiffness of equipment or components. Preventive measures: the long and thin, large equipment or components using lifting point hoisting; Thin wall equipment for reinforcement to strengthen; The weak parts of the steel structure, space truss structure or bar to reinforce or enlarging section.
2. A, materials to the project before the material supply department intends to submit the material demand plan, and after approval and supply department, before picking; Second, according to the examination and approval of material demand plan for acquisition; Thirdly, after the construction of surplus materials shall be handled in a timely manner to withdrawing money.
3. A, establish and perfect the system of the project material consumption and supply plan; Two, strictly implement the system of material use quota acquisition.
4. ABC classification and value engineering methods to save material, the role of is: the role played by the ABC classification is to find the focus of material management. The
您可能关注的文档
- 6万吨合成氨造气工段艺设计.doc
- 6创设有效情境 发学习兴趣.doc
- 6套法律逻辑学试题及案.doc
- 6提前准备:如何激励店员工.doc
- 6必威体育精装版湘教版八年级下第六章地理教案.doc
- 6小学语文教师素养大知识问答题目.doc
- 6月份露天矿安全现状查内容.doc
- 6河北省义务教育学校学基本标准.doc
- 6治疗高血压、高血脂方(药、食疗篇).doc
- 6语言学概论.简答题习题库.doc
- 2024高考物理一轮复习规范演练7共点力的平衡含解析新人教版.doc
- 高中语文第5课苏轼词两首学案3新人教版必修4.doc
- 2024_2025学年高中英语课时分层作业9Unit3LifeinthefutureSectionⅢⅣ含解析新人教版必修5.doc
- 2024_2025学年新教材高中英语模块素养检测含解析译林版必修第一册.doc
- 2024_2025学年新教材高中英语单元综合检测5含解析外研版选择性必修第一册.doc
- 2024高考政治一轮复习第1单元生活与消费第三课多彩的消费练习含解析新人教版必修1.doc
- 2024_2025学年新教材高中英语WELCOMEUNITSectionⅡReadingandThi.doc
- 2024_2025学年高中历史专题九当今世界政治格局的多极化趋势测评含解析人民版必修1.docx
- 2024高考生物一轮复习第9单元生物与环境第29讲生态系统的结构和功能教案.docx
- 2024_2025学年新教材高中英语UNIT5LANGUAGESAROUNDTHEWORLDSect.doc
文档评论(0)