Dynamic maagement with schedule and labor contract as the basis of the principle.doc

Dynamic maagement with schedule and labor contract as the basis of the principle.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Dynamic maagement with schedule and labor contract as the basis of the principle

Dynamic management with schedule and labor contract as the basis of the principle. 2. The rigger engaged in hoisting machinery operations, scaffolder engaging in the operations in which high erection, are prone to personnel casualty accidents, to the operator himself, others and the surrounding facilities safety significant danger. 3. The rigger and scaffolder belong to special operations personnel, according to the relevant provisions of the special operations personnel must hold relevant certificates. 4. General accident means killed 3 people below, the following serious injury accident or 10 people. 5. The main content of the hoisting plan should also include schedule; Resource planning (including human, machine, material, etc.); Safety technical measures; Risk assessment and contingency plans, etc. 1 P338 Case 1 h420070-2 】 【 Third, analysis and reference answer 1. The lifting device or component of the main causes of instability: design with a lifting force, small stiffness of equipment or components. Preventive measures: the long and thin, large equipment or components using lifting point hoisting; Thin wall equipment for reinforcement to strengthen; The weak parts of the steel structure, space truss structure or bar to reinforce or enlarging section. 2. A, materials to the project before the material supply department intends to submit the material demand plan, and after approval and supply department, before picking; Second, according to the examination and approval of material demand plan for acquisition; Thirdly, after the construction of surplus materials shall be handled in a timely manner to withdrawing money. 3. A, establish and perfect the system of the project material consumption and supply plan; Two, strictly implement the system of material use quota acquisition. 4. ABC classification and value engineering methods to save material, the role of is: the role played by the ABC classification is to find the focus of material management. The

文档评论(0)

xciqshic + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档