the prepartion before installation.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
the prepartion before installation

the preparation before installation; 2, pipe processing production; 3, support production and installation; 4, piping prefabrication and assembly; 5, pipe laying and installation; 6, pipe connected to the equipment; 7, instrument installation; 8, pressure testing and qing (blow) wash; 9, anticorrosion and thermal insulation; 10, debugging and commissioning; 11, the completion of acceptance. Six, project handover acceptance technology conditions (a) the condition of project handover acceptance formalities After completing all project construction units, construction units should be timely delivery acceptance formalities, project handover before acceptance, the construction unit to deal with industrial pipeline engineering check, and confirm that meet the following conditions: Construction scope and content in accordance with the provisions of the contract and design documents. The quality of the project comply with the provisions of the design documents and specifications. (2) the project handover acceptance of technical data Project handover before acceptance, the construction unit shall check the technical file of industrial pipeline engineering construction, construction records and test reports. 1. The technical documents (1) piping components of product certification, quality certification documents and the re-inspection, the test report. (2) pipe installation completion figure, design and modify the file material substitute for single. (3) the NDT and heat treatment after welding of pipes, accurately show that welding process in pipeline axonometric drawing information. Weld location, weld number, welder, for example, code, method of nondestructive testing, nondestructive testing of weld location, weld repair welding, heat treatment and hardness test of weld location, etc. 2. Construction records Piping components, for example, check the record, valve testing record, pipe bend processing records, pipeline welding inspection Chad records,

文档评论(0)

xciqshic + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档