3章C组D组术语课件.ppt

  1. 1、本文档共59页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
International Trade Terms GROUP C Group C: Main Carriage Unpaid CFR Cost and Freight 成本加运费 CIF Cost Insurance and Freight 成本、保险费加运费 CPT Carriage Paid To 运费付至 CIP Carriage Insurance Paid To 运保费付至 COST AND FREIGHT CFR(…named port of destination) Incoterms? 2010 The seller delivers the goods on board the vessel or procures the goods already so delivered (确保货物已如此装运). The risk of loss of or damage to the goods passes when the goods are on board the vessel. COST AND FREIGHT CFR(…named port of destination) Incoterms? 2010 The seller must contract for and pay the costs and freight necessary to bring the goods to the named port of destination. CFR 成本加运费 Cost and freight(…named port of destination) 3)Costs of the Seller Case Study: 某公司按CFR贸易术语与法国马赛一进口商签订一批抽纱台布出口合同,价值8万美元。货物于1月8日上午装“昌盛轮”完毕。业务员当天因经工作繁忙,待到9日上班时才想起给买方发装船通知。法商收到我装船通知向当地保险公司申请投保时,该保险公司已获悉“昌盛轮”已于9日凌晨在海上遇难而拒绝承担。于是法商立即来电表示该批货物损失应由我进出口公司承担并同时索赔8000美元,且拒不赎单。我方钱货两空的教训实值得吸取。 Case Study COST INSURANCE AND FREIGHT CIF(…named port of destination) Incoterms? 2010 Only for sea and inland waterway transport Place of delivery Contract of carriage Unloading expenses CIF: Cost Insurance and Freight (…named port of destination)成本、保险费加运费 Contract of Insurance The seller also has to procure marine insurance against the buyers risk of loss of or damage to the goods during the carriage. CIF=CFR + I 风险划分的问题 Case Study A Chinese exporter exported 500 M/T walnut to a Canadian importer on the basis of USD 4800 per M/T CIF Quebec. As it was a seasonal commodity, the importer required and both parties agreed to stipulate the following in the contract. L/C Issuing Date: to be issued by the end of September. Shipment: Not later than Oct.31, partial shipment and transshipment prohibited. Arrival Date: Not later than Nov.30. Otherwise, the buyer is entitled to refuse the goods. Terms of Payment: Draft at 90T/D under L/C. Due to the weather, the liner arrived at Quebec on Dec.5. Co

文档评论(0)

jiquhe72163 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档