MRPPERFORMANCE.doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Summary Symptom The runtime of materials planning (total planning or single-item planning) is unsatisfactory. Other terms Material requirements planning (MRP), RMMRP000, RMMRP010, RMMPS000, MD01, MD02, MD40, MS01, MS02, MDBT, MDBS, MSBT, AUSP Reason and Prerequisites The performance depends on a large number of factors: A. Organizational: A1) Type of the planning run: Net change or regenerative planning (intensive) A2) Planning mode: Reactivate or reset planning dates (intensive) A3) Lead time scheduling: no or yes (intensive) A4) Planning horizon A5) Create MRP lists: only for exceptions or always (intensive) A6) If the Purchasing Information System is active, the performance ????depends on whether the key figures are updated in a ????monthly, weekly or daily period split (intensive). A7) Parallel processing (improves the runtime significantly) B. Technical B1) Response times of the hard disks B2) Database B3) Buffering SAP number ranges B4) Program errors or unfavorable database accesses during lead time ????scheduling via the routing B5) Performance of the hardware B7-B9) Implementation of notes for specific performance problems Solution The runtime can generally be reduced significantly by technical and organizational measures. See Note 204517. Basically, take into account (sorted according to importance): B2, A1, A2, A7, B5, B1, A6, A5 During lead time scheduling: B4, A3 When configuring: B8 Long selection times for planning file entries at many plants (100) B9 A. Organizational ------------------ A1) Only use regenerative planning (NEUPL) in exceptional cases. A2) Only work with planning mode 3 ????Reset planning dates in exceptional cases (see Note 135788). A3) Scheduling via the routing is time and work intensive. ????The total runtime is strongly determined by how it is used. ????- Scheduling using the routing should be limited to the ??????time horizon in which it is required. ???? (Customizing: Production - Material Requirements Planning - Planning -

文档评论(0)

gangshou + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档