PracticeQuestionsforScope.doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Practice Questions INSTRUCTIONS: Note the most suitable answer for each multiple-choice question in the appropriate space on the answer sheet. Which statement about customer expectations is not true? The product or service should be usable as intended. Contractual provisions, including schedule and performance standards, should be met. Changes should be made immediately, and all customer wants should be satisfied without bureaucratic hassle. The seller should assume the responsibility of understanding customer needs and wants and addressing them effectively. 关于客户期望的哪个说法是不正确的? 产品或服务应按预期的可以使用 应该满足合同条款,包括日程和执行标准 变更应该立即进行,所有客户想要的都要没有争议地满足 卖方应该负有了解客户希望和要求的责任并有效处理 The WBS is an input to scope change control because it— Provides information on project objectives Defines the project’s scope baseline Defines all project baselines Provides information on scope performance WBS是对范围变更控制的输入是因为: 在项目目的上提供信息 定义项目范围的基准 定义所有项目基准 在范围执行上提供信息 The document that describes the objectives, work content, deliverables, and end product of a project is the— Project charter Product description Scope statement WBS 描述项目目的、工作内容、可交付成果和最终产品的文件是: 项目章程 产品描述 范围陈述 WBS When an organization chooses a project selection model, the most important criterion is— Capability Realism Ease of use Cost 当一个机构选择一个项目选择模式时,最重要的原则是: 能力 现实性 容易使用 开支 Maintenance is crucially important to projects and should— Be included as an activity to be performed during the closeout phase Have a separate phase in the life cycle in information systems projects because 60% to 70% of life-cycle costs of computer systems are generally devoted to maintenance Not be viewed as part of the project life cycle Always be viewed as a separate project 维护对项目至关重要,应该: 作为在收尾阶段进行的行为被包含在内 在信息系统项目生命周期里有单独的阶段,因为通常计算机系统生命周期开支的60%到70%花在维护 不被看作项目生命周期的一部分 总是被看做独立的项目 A project manager’s company operates in a high-technology area requiring the integration and sharing of several functional specialties. The project manager is considering the appropriate organiz

文档评论(0)

gangshou + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档